Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 16,1996 PSA#1596

Department of the Navy, NAWCAD Contracts Competency Division, MS32, 22541 Millstone Road, Patuxent River, MD 20670-5304

66 -- 1GHZ - 8GHZ AMPLIFIER SYSTEM SOL NOO421-96-R-1075 DUE 052996 POC Chris Lyons, Contract Specialist, Code 2611CL Janice Tyson, Contracting Officer, Code 2611JT (301) 342-1825 ext. 212. This is amendment 001 to the synopsis/solicitation N00421-96-R-1075 for a 1GHZ - 8GHZ Amplifier System that originally appeared in the CBD on Thursday, April 25, 1996, Issue No. PSA-1581. The purpose of this amendment is to answer questions from potential offerors. The following are the questions and answers pertaining to this procurement to date: (1) QUESTION: Requirement: Gain Control with 35 dB of adjustment range is required. Is the gain to be controlled from the front panel, remote control station, or both? ANSWER: The gain control should be located on the front panel. (2) QUESTION: Requirement: Noise Power Density no greater than 60 dBm/Hz. Normally, TWTA Noise Power Density is specified in (-) dBm/Hz. Is it possible that a (-) sign has been omitted? ANSWER: Yes, the (-) sign was omitted. (3) QUESTION: An amplifier ''system'' is specified. Is it the intention that the amplifier(s) required to meet the specification be installed by the contractor in a rack or enclosure as part of the subject procurement?: ANSWER: Separate amplifiers are acceptable. Provisions for rack mounting are required, but the amplifiers do not need to be placed in a cabinet by the manufacturer. (4) QUESTION: Line power is not specified. What are the input power requirements? ANSWER: Either single phase 115VRMS single phase, 208VRMS (L-L) or 115VRMS 3 phase, 60Hz is acceptable. (5) Requirement: the contractor shall deliver CLIN 001 with the Contract Data Requirements List (CDRL) within 30 days after contract award. Is this a firm requirement? Will responses with delivery schedules outside the 30 day time period be considered non-responsive. ANSWER: The 30 day delivery schedule is a firm requirement. Responses with delivery schedules outside the 30 day time period shall be considered non-responsive. Responses to this solicitation should include acknowledgment of receipt of this amendment. The proposal due date of 29 May 1996 remains unchanged. Any further questions regarding this procurement should be submitted before 2:30 PM Eastern Standard Time 20 May 1996 to Mr. Chris Lyons, Contracts Projects Division, Bldg. 588, M/S 32, Naval Air Warfare Center Aircraft Division, Patuxent River, MD 20670-5304, Fax 301/342-1864. The responses to those questions shall be addressed in a future amendment to be published in the Commerce Business Daily. (0135)

Loren Data Corp. http://www.ld.com (SYN# 0351 19960515\66-0001.SOL)


66 - Instruments and Laboratory Equipment Index Page