|
COMMERCE BUSINESS DAILY ISSUE OF MAY 16,1996 PSA#1596Department of the Navy, NAWCAD Contracts Competency Division, MS32,
22541 Millstone Road, Patuxent River, MD 20670-5304 66 -- 1GHZ - 8GHZ AMPLIFIER SYSTEM SOL NOO421-96-R-1075 DUE 052996 POC
Chris Lyons, Contract Specialist, Code 2611CL Janice Tyson, Contracting
Officer, Code 2611JT (301) 342-1825 ext. 212. This is amendment 001 to
the synopsis/solicitation N00421-96-R-1075 for a 1GHZ - 8GHZ Amplifier
System that originally appeared in the CBD on Thursday, April 25, 1996,
Issue No. PSA-1581. The purpose of this amendment is to answer
questions from potential offerors. The following are the questions and
answers pertaining to this procurement to date: (1) QUESTION:
Requirement: Gain Control with 35 dB of adjustment range is required.
Is the gain to be controlled from the front panel, remote control
station, or both? ANSWER: The gain control should be located on the
front panel. (2) QUESTION: Requirement: Noise Power Density no greater
than 60 dBm/Hz. Normally, TWTA Noise Power Density is specified in (-)
dBm/Hz. Is it possible that a (-) sign has been omitted? ANSWER: Yes,
the (-) sign was omitted. (3) QUESTION: An amplifier ''system'' is
specified. Is it the intention that the amplifier(s) required to meet
the specification be installed by the contractor in a rack or enclosure
as part of the subject procurement?: ANSWER: Separate amplifiers are
acceptable. Provisions for rack mounting are required, but the
amplifiers do not need to be placed in a cabinet by the manufacturer.
(4) QUESTION: Line power is not specified. What are the input power
requirements? ANSWER: Either single phase 115VRMS single phase, 208VRMS
(L-L) or 115VRMS 3 phase, 60Hz is acceptable. (5) Requirement: the
contractor shall deliver CLIN 001 with the Contract Data Requirements
List (CDRL) within 30 days after contract award. Is this a firm
requirement? Will responses with delivery schedules outside the 30 day
time period be considered non-responsive. ANSWER: The 30 day delivery
schedule is a firm requirement. Responses with delivery schedules
outside the 30 day time period shall be considered non-responsive.
Responses to this solicitation should include acknowledgment of receipt
of this amendment. The proposal due date of 29 May 1996 remains
unchanged. Any further questions regarding this procurement should be
submitted before 2:30 PM Eastern Standard Time 20 May 1996 to Mr. Chris
Lyons, Contracts Projects Division, Bldg. 588, M/S 32, Naval Air
Warfare Center Aircraft Division, Patuxent River, MD 20670-5304, Fax
301/342-1864. The responses to those questions shall be addressed in a
future amendment to be published in the Commerce Business Daily.
(0135) Loren Data Corp. http://www.ld.com (SYN# 0351 19960515\66-0001.SOL)
66 - Instruments and Laboratory Equipment Index Page
|
|