FORT MCPHERSON GA 30330 6000 Z -- MODIFY HVAC SYSTEM, BUILDING 101, FORT GILLEM, GEORGIA SOL
DAKF11-96-B-0009 DUE 071596 POC Contract Specialist LYNDA S. SEARCY
(404) 752-4105 (Site Code DAKF11) Contractor shall furnish all labor,
equipment and material and perform all work required to replace
existing suspended acoustical tile ceilings. Replace existing fan coil
system with new ducted air conditioning system including air handler,
power induction terminal units, variable air volume terminal units,
hot and chilled piping systems, centrifugal pumps and required
electrical systems. Demolish existing partitions and construct new
mechanical rooms for air handling units. Install new ceiling batt
insulation on the 4th floor. Rewire electrical power poles and
suspended ceiling recessed fluorescent lights to provide new branch
circuits; include material and labor cost for new wiring, switches and
junction boxes only. Removal and re-installation of power poles and
lights is related to ceiling removal is therefore part of the
maintenance and repair work. The magnitude of this project is between
$1,000,000 and $5,000,000. Contract completion time is 365 calendar
days after receipt of the Notice To Proceed. This project is subject to
the availability of funds. All eligible and responsible sources may
submit an offer which will be considered. Written or faxed (404-752-