|
COMMERCE BUSINESS DAILY ISSUE OF MAY 20,1996 PSA#1598Federal Aviation Administration, Mike Monroney Aeronautical Center,
Aviation Acquisition Contracting Team, AMQ-410, P.O. Box 25082, 6500 S.
MacArthur Blvd., Oklahoma City, OK 73125-4929 70 -- FLIGHT STANDARDS PROBLEM RESOLUTION AND SUPPORT SERVICES SOL
50-96-Q-612985 DUE 053096 POC Brenda Holmes, Contracting Officer, (405)
954-7850 The Federal Aviation Administration (FAA) intends to place an
order against BTG Inc's 1996 GSA Schedule Contract for support
services for the WAN implementation. The following is a basic
description of the services to be provided: FAA's Flight Standards
Service (AFS) is in the process of building a communications
infrastructure that will provide connectivity to all AFS organizations
to establish the foundation for Electronic Data Interchange (EDI) and
Electronic Commerce (EC) facilitation. AFS has designed a Wide Area
Network (WAN) that provides dedicated circuit connectivity to all
Flight Standards District Offices (FSDOs) and Regional Offices (Ros).
The connectivity of these 110 locations assures AFS that data can be
transported to any AFS organization. FAA flight standards requires
support services in the effort to implement this WAN. The tasks for
this support are detailed as follows and covers the range of activities
required to provide WAN support and problem resolution for all AFS
sites. The AFS WAN is the most critical infrastructure component in the
Flight Standards Enterprise Architecture for facilitating Electronic
Data Interchange (EDI) as well as Electronic Commerce. The work to be
performed includes the contract support requirements for the WAN
implementation and are divided into four discrete tasks: 1. WAN Support
Services: Problem Resolution 2. Planning and testing support services
for WAN. 3. Administrative and Support Procedures Documentation These
tasks are described below in detail: 1. PROBLEM RESOLUTION - This task
requires that the contractor assist AFS in defining and resolving
problems related to the WAN day-to-day usage. This task shall provide
all activities associated with AFS LAN Administrators and AFS users
utilization issues, whether problems or enhancement requests, for the
continuing WAN infrastructure. The WAN support personnel will also
directly interface with the AFS Safety Support Hotline and the ADTN
2000 contractor, GSI. Services to be provided by the contractor
include: . Monitor and track WAN-related issues. Work with LAN
Administrators in bring WAN-related issues to resolution. . Work with
GSI and AFS-620 in resolving the problem. . Once the problem is
determined to be resolved, conduct tests to ensure the problem is
resolved. 2. PLANNING AND TESTING SUPPORT SERVICES - This task shall
require the contractor to perform activities interacting with the WAN
Support Services team to determine all post-implementation support
criteria for AFS WAN upgrades and enhancements. These activities shall
include: . Maintain a ''simulated'' AFS LAN/WAN environment for issue
reproduction and resolution . Develop procedures for ongoing,
post-implementation support services impacted by WAN enhancements. .
Provide the testing to ensure any new procedures and enhancements will
not negatively impact AFS WAN users. 3. ADMINISTRATIVE AND SUPPORT
PROCEDURES DOCUMENTATION - This task shall require the contractor to
develop and maintain WAN problems resolution procedures, as well as WAN
issues status reports, and other statistical reports as required.
Monthly status reports shall also be required. The above required tasks
will be conducted at the contractor facilities and required government
locations. The Standard Industrial Classification (SIC) code is 3577.
The intent of this synopsis is to determine whether any other
source(s) exist, therefore, no RFQ is available. Interested parties are
invited to identify their interest and capability to provide the
required services within 5 calendar days of this synopsis. Comparable
services will be considered only if clear and convincing documentation,
including technical and pricing information is furnished. All responses
from responsible sources will be fully considered. As a result of
analyzing responses to this synopsis of intent, the contracting officer
may determine that an open market purchase may be in the Government's
best interest in lieu of buying off of the GSA Schedule. If an open
market purchase is to be made the intended schedule vendor and all
firms that respond to this synopsis of intent will be put on the
bidders list. The services are only known to be available from BTG,
Inc. Other concerns having the ability to furnish the above services
are requested to give written notification including the name and
telephone number of a point of contact) to the procuring office listed
in this notice, with reference made to file # 50-612983 within 5
calendar days from the date of this publication. Responses should
provide information regarding the ability of your company to satisfy
the Government's requirement. All responses to this synopsis will be
considered prior to further acquisition action by the Government. Any
information received as a result of this announcement will not be
provided to other contractors and will normally be considered solely
for the purpose of determining whether to conduct a competitive
procurement in lieu of a limited competitive procurement. The final
determination by the Government not to open this requirement to
competition between other manufacturers, based on any information
provided, is solely within the discretion of the Government. Responses
to this synopsis should be submitted by facsimile to (405) 954-3030.
Attn: Brenda Holmes (0137) Loren Data Corp. http://www.ld.com (SYN# 0320 19960517\70-0001.SOL)
70 - General Purpose ADP Equipment Software, Supplies and Support Eq. Index Page
|
|