COMMERCE BUSINESS DAILY ISSUE OF MAY 21,1996 PSA#1599Department of the Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- ASBESTOS REMOVAL AT KNIGHTVILLE DAM UTILITY BUILDING, HUNTINGTON,
MA; LITTLEVILLE LAKE UTILITY AND OPERATORS BUILDING, HUNTINGTON, MA;
AND TULLY LAKE UTILITY BUILDING, ATHOL, MASSACHUSETTS SOL
DACW33-96-Q-0086 DUE 070896 POC Julie Mackley, 617-647-8413 The work of
this contract will consist of the removal and disposal of asbestos
containing pipe insulation and asbestos contaminated building materials
from the utility buildings and a dam operations building at three dam
sites. Some of the removed pipe and fiberglass insulation will be
replaced with new insulation. Estimated cost of the work is between
$25,000.00 and $100,000.00. Work shall be completed within 90 calendar
days. Specifications available on or about 061296 at a cost of $10.00
per set. All responsible sources may submit a bid which will be
considered by the New England Division. (0138) Loren Data Corp. http://www.ld.com (SYN# 0151 19960520\Z-0030.SOL)