|
COMMERCE BUSINESS DAILY ISSUE OF MAY 24,1996 PSA#1602Operational Contracting, 8005 9TH ST, Brooks AFB TX 78235-5353 99 -- DEPLOYABLE CHEMICAL ANALYSIS LABORATORY SOL F41622-96-R-0040 POC
Juan A. Villarreal, Contracting Officer, 210-536-6224. Brooks AFB TX
Operational Contracting requires a fully transportable, rapid-response.
independently deployable Chemical Analysis Laboratory. The Chemical
Analysis Laboratory must be housed in a standard-size 40 foot long ISO
container. Container must incorporate appropriate connections to mate
with all standard modes of transportation, e.g. airplane, truck, or
rail. A 3 foot wide entrance with lockable door must be located within
the ISO container's full-width doors. Laboratory walls, floor and roof
must be hardened to protect against the shock and vibration encountered
during air, land, and sea transportation. The sensitive analytical
equipment must be shock and vibration mounted on chemical resistant
benches. Benches must be shock and vibration mounted as well to provide
a second level of isolation for the analytical equipment. The
Laboratory itself must incorporate vibration isolation for all onboard
mechanical equipment to provide a third level of isolation for the
equipment. The mounting of the analytical equipment in the Laboratory
must be designed so the Laboratory can be transported with minimal
equipment dismantling. The Chemical Analysis Laboratory must be
equipped with cabinets and benches to support laboratory operations.
Cabinets and benches must be of non-combustible materials. Flooring and
wall covering must be of chemical resistant material. Wall covering
must be of fire retarten material. All ductwork must be insulated to
minimize noise. Laboratory must filter all incoming air through High
Efficiency Particulate Air and carbon filters, and over pressurization
to ensure that all leakage is from the interior of the Laboratory to
the outside. Laboratory design must also have some type of ballistic
protection to protect against conventional small arms fire. Laboratory
must must carry its own onboard electrical generator system. The
generator must be removable and connected outside upon reaching the
project site. The Laboratory must be designed to accept power from
external sources as well as its own generator. Electrical power must be
filtered (frequency and voltage stabilized) to provide a stable source
of electrical power. An uninteruptable power source must be provided.
The Chemical Analysis Laboratory must be equiped with full
communication capabilities, including satellite link-up and a STU-II
telephone for secure communications. The Laboratory must have an
onboard heating, ventilation and air conditioning (HVAC) system
temperature and humidity within close tolerances over a wide range of
outside conditions (-20 to +120 degrees F). Interior temperatures must
be maintained between 68 - 74 degrees F +/- 3 degrees F over this
range. The Chemical Analysis Laboratory must accept analytical
equipment to perform all required chemical analyses. This includes a
Purge and Trap Gass Chromatograph/Mass Spectrophotometer (GC/MS),
GC/MS, Inductively Coupled Plasma (ICP) Spectrometer. Infared
Spectrophotometer (IR), sample preparation equipment, and suppory
computers. The Laboratory must be equiped with a full-face (6 foot
minimum openning width) chemical fume hood for sample handlinf and
preparation. Benches and support platforms for analytical equipment
will be designed for easy and rapid interchangeability
ofinstrumentation. This ''plug-n-play'' system will provide all
electrical, gas, waste drains, cooling lines and/or other connections
required for full operation. A Laboratory Information Management System
must be included in the hardware provided with the laboratory. This
system will be capable of communication with the specified
instrumentation, collection of data, calculation of results, and
production of data packages in accordance with mandated guidelines.
Offerors must provide a heating and cooling balance in accordance with
ASHRAE standards to size the HVAC system. The analysis shall consider
heat loads from the analytical equipment as well as external
temperature conditions. Offerors shall provide a one-line electrical
diagram to size the electrical generator and distribution system. This
analysis shall include power requirements during HVAC system start-up
and maximum consumption by onboard equipment. The laboratory must have
the ability to be transported easily via an independent mobilizing
system allowing the laboratory to be towed or pulled up to 60 MPH on
conventional highways without specialized towing equipment. Offerors
must provide references for three transportable chemical analysis
laboratories, similar to the Chemical Analysis Laboratory specified in
this announcement, that the offeror has designed and built. FOB
Desination Brooks AFB TX. No telephone requests will be accepted.
Request all prospective sources submit a written request to Operational
Contracting, Attn: Juan A. Villarreal, 8005 9TH ST, Brooks AFB TX
78235-5353 or FAX# 210-536-9070. All responsible sources will be fully
considered. (0143) Loren Data Corp. http://www.ld.com (SYN# 0456 19960523\99-0001.SOL)
99 - Miscellaneous Index Page
|
|