|
COMMERCE BUSINESS DAILY ISSUE OF MAY 24,1996 PSA#1602U.S. Army Engineer District, Alaska, ATTN: CENPA-EN, P.O. Box 898,
Anchorage, AK 99506-0898 (Physical Address: Bluff & Plum Streets,
Building 21-700 (Rm 250), Elmendorf AFB, AK 99506-0898) C -- ARCHITECT-ENGINEER SERVICES CONTRACT DESIGN TO RENOVATE DOD
SCHOOL, BEN EIELSON JUNIOR/SENIOR HIGH SCHOOL, EIELSON AFB, ALASKA SOL
DACA85-96-R-0022 POC Administrative Inquiries: Ms. June Wohlbach,
907/753-5624 or Technical Inquiries: Mr. Dave Piening, 907/753-5609,
Contracting Officer: Ms. Gail West 1. CONTRACT INFORMATION: This
announcement is open to all businesses regardless of size. If a large
business is selected for this contract, it must comply with FAR
52.219-9 regarding the requirement for a subcontracting plan for that
part of the work it intends to subcontract. The subcontracting goals
for this contract are a minimum of 60.3% of the contractor's intended
subcontract amount be placed with small businesses, 9.8% of that to
small, disadvantaged businesses, and 2.9% to woman-owned businesses.
The subcontracting plan is not required with this submittal. All
responders are advised that this project may be canceled or revised at
any time during the solicitation, selection, evaluation, negotiation
and final award. Contract award is anticipated for Aug 96. 2. PROJECT
INFORMATION: Design construction documents for the renovation and
addition to Ben Eielson Junior/Senior High School in Fairbanks, Alaska.
The school will be transferred to the Fairbanks North Star Borough
School District (FNSBSD) property inventory. To complete this transfer
the school requires renovation in order to comply with current
building codes and FNSBSD specifications. General renovation of the
school includes but is not limited to mechanical and electrical
upgrades, asbestos and lead-based paint abatement, handicap access,
structural analysis and upgrades, roof repairs, reconfiguration of
playground and parking areas, reconfiguration of existing building
spaces, and energy and thermal standard upgrades. Currently 6 portable
classrooms are attached to the school. They are at the end of their
useful service and are in violation of building codes. These portables
shall be removed and a new 9,890 SF of space added to the school. The
new space will house 6 classrooms, an orchestra room, a weight room,
and storage. The designer shall prepare the education specifications
for the school renovation/addition. The education specifications shall
be prepared using a school administration/designer focus group concept
to be facilitated by the designer. A member of the design team shall be
an education specialist with a background in kindergarten through 12th
grade education and experience as a facilitator and education
specification writer.--LOCATION: Eielson AFB, Alaska. 3. SELECTION
CRITERIA: The following selection criteria headings are listed in
descending order of importance (weighted equally): (A) professional
personnel in the following disciplines: (1) minimum in-house
requirement is an architect with 5 years experience; (2) disciplines
which may be subcontracted: education specification writer, mechanical,
electrical, civil, structural, cost estimator, and hazardous materials.
Responding firms MUST address each discipline, clearly indicate which
shall be subcontracted, and MUST provide a separate SF254 and SF255 for
each subcontractor necessary. The contractor shall employ, for the
purpose of performing that portion of the contract work in the State of
Alaska, individuals who are residents of the State, and who, in the
case of any craft or trade, possess or would be able to acquire
promptly the necessary skills to perform the contract. (B) specialized
experience and technical competence in: (1) the design of building
renovation and addition projects, (2) experience in the writing junior
and senior high school education specifications, and (3) thermal
envelope analysis and retrofit experience, and experience in school
design; and (4) experience in school design; (C) capacity to maintain
schedules; (D) past performance on DOD and other contracts with respect
to cost control, quality of work, and compliance with schedules; (E)
location of the firm in general geographical area of the projects and
knowledge of locality; (F) volume of DOD contract awards in the last 12
months as described in Note 24; and (G) extent of participation of SB,
SDB, historically black colleges and universities, and minority
institutions in the proposed contract team, measured as a percentage of
the estimated effort. 4. SUBMISSION REQUIREMENTS: Firms must submit an
SF 254 and SF 255 (1 copy only) and should include: (1) organization
of proposed project team, (2) responsibilities and authority of key
project personnel, (3) relationship of project team to overall
organization of the firm, (4) a quality control plan, and (5) in block
8c of the SF 255 include a POC and phone number. The 11/92 edition of
the forms MUST be used, and may be obtained from the Government
Printing Office, by calling the administrative contact named above, or
from commercial software suppliers fro use with personal computers and
laser printers. Submittals must be received at the address indicated
above not later than COB (4:00 pm Alaska time) on the 30th day from the
date of this announcement. If the 30th day is a Saturday, Sunday, or
Federal holiday, the deadline is the close of business of the next
business day. No additional information shall be provided, and no faxed
submittals shall be accepted. This is not a request for proposal.
(0143) Loren Data Corp. http://www.ld.com (SYN# 0028 19960523\C-0011.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|