COMMERCE BUSINESS DAILY ISSUE OF MAY 28,1996 PSA#1603United States Property and Fiscal Office, P.O. Box 40748, Powell
Avenue, Nashville, TN 37204-0748 Y -- CONSTRUCT PMEC SCHOOL TRAINING QUARTERS FOR THE TENNESSEE AIR
NATIONAL GUARD, MCGHEE TYSON AIRPORT, KNOXVILLE, TENNESSEE Sol
DAHA40-96-B-0004. Contact CW3 Sharon E. Price, Contract Specialist,
(615) 313-2651, or LTC James L. Coonce, Contracting Officer, (615)
313-2650. Provide labor, materials, equipment, and services, and
perform work necessary for the construction of the PMEC School Training
Quarters for the Tennessee Air National Guard at McGhee Tyson Airport
in Knoxville, Tennessee. The new facility will consist of 3 multi-story
buildings interconnected with exterior covered walkways and
stairtowers. Total size of the facility is approximately 40,000 gross
square feet. Construction work includes demolition, sitework including
underground utility work, concrete, masonry load bearing walls, brick
veneer, structural steel including steel joists, waterproofing, metal
roofing, insulated built-up roofing system, sheet metal, hollow metal
doors and frames, wood doors, aluminum frame doors and windows,
glazing, window blinds, plumbing, fire protection sprinkler system,
heating, ventilation and air conditioning, electrical systems, interior
and exterior lighting, communication-alarm-signal systems, interior and
exterior painting, and architectural millwork. All of the work
described above is to be accomplished within the compound of the
Tennessee Air National Guard at McGhee Tyson Airport, Knoxville,
Tennessee. Performance time is 730 calendar days. Plans and refundable
certified check or money order is required for plans and
specifications in the amount of $109.00 made payable to the Treasurer
of the United States. The solicitation will be furnished at no cost.
Plans and specifications will also be available for review at various
plans houses within the state. Contractors should call the Contract
Specialist listed above for these locations. The estimated construction
cost is between $1,000,000.00 and $5,000,000.00. This project is open
to large as well as small businesses (unrestricted). (141) Loren Data Corp. http://www.ld.com (SYN# 0131 19960524\Y-0006.SOL)