COMMERCE BUSINESS DAILY ISSUE OF JUNE 10,1996 PSA#1612Commanding Officer, Engineering Field Activity West, 900 Commodore Dr.
San Bruno, CA 94066-5006 Z -- FY96 HOUSING PROJECT J-374, WHOLEHOUSE REVITALIZATION TO 104
BRUNS PARK UNITS (PHASE II) AT NAVAL CONSTRUCTION BATTALION CENTER, PT
HUENEME, CALIFORNIA SOL N62474-95-R-2877 DUE 073096 POC CHARLOTTE
DOMINGUEZ, CONTRACT SPECIALIST at (415) 244-2977, Contracting Officer,
Bobby Ellis. PRE-SOLICITATION NOTICE: This RFP is a source selection
procurement for wholehouse repairs/improvements to 104 Bruns Park
family housing units. This project is to be acquired by negotiation
with qualified offerors based on technical and price competition. Price
and evaluation factors are approximately equal in weight. Evaluation
Factor #1: PAST PERFORMANCE - This factor demonstrates a commitment to
quality, cooperative working relationship, customer satisfaction with
timely completion at a fair and reasonable price. Evaluation Factor
#2: EXPERIENCE OF THE FIRM AND KEY PERSONNEL - This factor considers
the Offeror's and key personnel's experience in undertaking projects of
similar scope and complexity. Evaluation Factor #3: PROJECT MANAGEMENT
PLAN - This factor considers the quality and efficacy of the Offeror's
overall management strategy for accomplishing the specific work of this
solicitation. The strategy is evaluated to determine that it is
reasonable, comprehensive, and methodical and illustrates an
understanding of critical and/or high risk issues that need management
focus to ensure a quality product delivered on schedule. Evaluation
Factor #4: SUBCONTRACTING COMMITMENT - This factor considers the extent
of the Offeror's commitment to subcontracting with Small Business,
Small Disadvantaged Businesses, and Women-owned Small Business
Concerns. If a large business, this factor also considers the past
performance of the Offeror in complying with requirements of FAR Clause
52.219-8 Utilization of Small, Small Disadvantaged and Women-Owned
Small Business Concersn, and FAR Clause 52.219-9 Small, Small
Disadvantaged and Women-Owned Small Busniess Subcontracting Plan. --
The work includes the furnishing of all labor, materials and equipment
necessary to completely renovate the interior and exterior of 20
existing multi-family housing buildings containing 104 units. The work
in this contract will be accomplished in four phases. Repairs and
improvements shall include, but are not limited to the following:
Complete renovation of kitchens and bathrooms; replacement of flooring;
windows and various doors and hardware; revisions to interior walls;
installation of insulation; complete plumbing and electrical upgrades;
installation of forced air units, ducts and roof caps; installation of
water heaters and a fire protection system; excavation and replacement
of gas service risers, water valves, sewer and water laterals; rmoval
of hazardous materials; provision of pest control; removal and
replacement of carports and incidental related work as required.
Optional Bid Item 1: The work includes the furnishing of all labor,
materials and equipment necessary to remove and replace roofing on 20
multi-family housing buildings (containing 104 units) in four phases.
Removal and replacement shall include, but is not limited to the
following: removal of existing aggregate surfaced built-up roofing,
installation of new underlayment and new asphalt shingles, installation
of skylights, sheet metal and flashing, and incidental related work as
required. Optional Bid Item 2: The work includes the furnishing of all
labor, materials and equipment necessary for exterior site improvements
surrounding 20 multi-family housing buildings (containing 104 units) in
four phases. The exterior improvements shall include, but is not
limited to the following: wood fence removal and replacement;
installation of irrigation sprinkler systems, installation of trees and
shrubs, renovation of turf areas, removal and replacement of concrete
flat work, and incidental related work as required. -- Estimated
Construction Cost is between $5million and $10million. Contract
duration is approximately 720 calendar days. The proposed contract is
UNRESTRICTED. The Standard Industrial Code (SIC) is 1521 and the
related small business size standard is $17million. -- Offerors shall
request a copy (one copy per company) of solicitation IN WRITING
stating RFP No. N62474-95-R-2877 with complete company name, address,
area code and telephone number, and identify whether company will be
bidding as supplier, subcontractor, or prime. Telephone requests WILL
NOT be accepted. Mail requests to Engineering Field Activity - West,
NAVFACENGCOM, Code 02T2.CD, Bldg 203 (2nd floor), 900 Commodore Drive,
San Bruno, CA 94066-5006 or fax request to (415) 244-2986. -- Plans
and specifications will be available on or about 17 JUNE 1996 on a
first-come-first-served basis until supply is exhausted. No deposit is
required. All qualified, responsible sources may submit a proposal
which shall be considered by the agency. Information regarding receipt
of proposals WILL NOT BE AVAILABLE since this is a negotiated
procurement. (0158) Loren Data Corp. http://www.ld.com (SYN# 0137 19960607\Z-0001.SOL)