COMMERCE BUSINESS DAILY ISSUE OF JUNE 11,1996 PSA#1613OICC, Box 368113, Navy Public Works Center, 2730 McKean Street, San
Diego, CA 92136 C -- SOURCES SOUGHT FOR ARCHITECT-ENGINEERING (A-E) SERVICES FOR
VARIOUS PROJECTS INVOLVING ELECTRICAL DESIGN FOR THE NAVY PUBLIC WORKS
CENTER, SAN DIEGO, CA SOL SSELECDSG-96-1 DUE 071196 POC Contact Janet
Barbot, Contract Specialist at (619) 556-1442. The Navy Public Works
Center, San Diego, CA is currently seeking sources for services for
Electrical Design with associated multi-discipline
architectural-engineering (A-E) support services. An indefinite
Quantity firm fixed price type contract will be awarded to the
selected, most qualified firm responding to this announcement. The
Indefinite Quantity contract shall be for $400,000. The contract shall
be for 365 days. The proposed contract includes a second year option
for an additional $400,000. The services required may included, but not
be limited to, all or part of the following: (1) preparation of
technical reports including engineering investigations and concept
studies; (2) special project documentation; (3) preparation of
preliminary and final designs; (4) preparation of contract drawings and
specifications; (5) preparation on cost estimates and sketches; (6)
provide engineering advice during construction (i.e. office
consultation, shop drawing review, as-built drawing preparation, field
consultation and verification, and/or value engineering); and (7)
construction inspection and other Title II services. The types of
design projects involve primarily repair, alteration, and installation
of (1) 12kV underground and overhead electrical distribution systems
including pad and pole mounted transformers, substations and
switchgears; (2) ship to shore power; (3) metering and utility control
systems; (4) emergency generators and uninterruptible power supply
(UPS) equipment; (5) fire alarm system; (6) intrusion detection system;
(7) cathodic protection system; (8) grounding and lightning protection
systems; (9) communication systems including public address and
telephone systems; (10) 400 Hz power system; (11) power upgrade and
(12) indoor and outdoor lighting for all Navy Shore Facilities for the
Navy Public Works Center, San Diego and its customer activities. If
asbestos or hazardous material is present, the A-E will be required to
identify them and provide for their disposal or treatment in
construction plans and specifications in accordance with applicable
rules and regulations. When the indefinite quantity contract is
awarded, the fee for any individual negotitated work order in NTE
$100,000 with a cumulative total of all work orders NTe $400,000 during
a one year period. Commencement and completion of work is subject to
the requirements of individual work orders. Firms which design or
prepare specifications for all construction contract or procurement of
supplies cannot provide the construction or supplies. The limitation
also applies to subsidiaries and affiliates of the firm. A-E selection
criteria is listed in descending order of importance as follows: (1)
professional qualifications necessary for satisfactory performance of
required services; (2) recent (1990) to present) specialized experience
and technical competence of the firm in the type of work required; (3)
capacity to accomplish the work in the required time; (4) past
performance on contracts with Government agencies and private industry
in terms of cost control effectiveness, quality of work, and
compliance with performance schedules; (5) Location in the general
geographic area of the project and knowledge of the locality of the
project (local site conditions and design requirements), provided that
application of this criterion leaves an appropriate number of
qualified firms, given the nature and size of the project, (6)
Demonstrated success in prescribing the use of recovered materials and
achieving waste reduction and energy efficiency in facility design,
(7) list the small or disadvantaged or women-owned business firms as
primary consultants or as subcontractors, (8) value of DOD contract
awards within the last 12 months. Evaluation criterion (1) through (4)
are the primary evaluation factors in the determination of the most
highly qualified firm. Criterion (5) through (8) are secondary factors
that will become a consideration in the event that all firms are
considered equal on factors (1) through (4). To demonstrate how the
firm meets the qualification criteria: (Block 3 or 3b) List firm
actually performing the work; (Block 7) Submit a matrix for the design
team. Individual rows should be labeled with the team member's names
and their proposed team assignments. Columns should be labeled as
follows: firm name and office location; percent of time to be spent on
this team; professional registration in California; highest education
level and area of specialization; number of years of professional
experience; number of years with current firm; for project managers,
identify the number of teams managed over the past three years; and
list experience on projects in relation to the above criteria. (Block
8) In addition to information requested in Block 8, provide a matrix
with experience in relation to the types of design projects listed in
this synopsis. (Block 10) Include the following: Staff availability,
status of current workload, show plan for managing multiple concurrent
work orders; Provide final design estimate and construction contract
award amounts for 8 projects which are similiar in nature and size to
the types of design projects advertised; Briefly describe the firm's
internal quality control procedure; Provide an organization chart of
the firm, including all offices and personnel who would perform design
services under this contract. The SF 255 with attachments is limited
to 50 pages (preferably 12 pitch font). A page may consist of text or
picutres on both front and back of a single sheet of paper. Every page
that is not a SF 254 will be included in the page count. Failure to
provide the above information may result in the firm being considered
non-responsive. For the definitions of ''small business'', ''small
disadvantaged business'' and ''emerging small business'', please refer
to the Federal Acquisition Regulations (FAR) Part 19.
Architect-Engineer firms which meet the requirements described are
required to submit the following: current SF255, U.S. Government
Architect-Engineering Qualifications, including an organizational chart
of key personnel to be assigned to the projects, a current SF 254
Architect-Engineer and Related Services Questionnaire and any
Consultant/Subcontractor's current SF 254. Responding firms are
required to clearly identify tasks to be performed in-house and those
to be subcontracted. Firms must submit the names and supporting
qualifications data of all subcontractors. The dollar value of all work
for DOD and Corps of Engineers for the past five years must be clearly
stated in block 9 of the SF 254. Firms must indicate in Block 4 of SF
254 whether they are a small business, small disadvantaged business,
woman-owned business, or emerging small business. Firm is required to
provide specifications in the SPECSINTACT SGML format and provide final
drawings in computer-aided drafting files compatible with AUTOCAD
Release 12 or 13. FIRMS ARE REQUIRED TO HAVE EXPERIENCE IN ALL
AFOREMENTIONED TYPES OF PROJECTS. All interested firms should submit a
Standard Form 254 and 255 to OICC Navy Public Works Center, Code 211,
2730 McKean Street, Suite 1, Naval Station, San Diego, CA 92136-5294
by 4:00 pm (PST) on 11 July 1996. If delivered by courier service,
hand-delivered, etc, Standard Form 254 and 255 should be delivered to
the Navy Public Works Center, Code 211, 32nd Street, Naval Station,
Building 121 (1st Floor). Submittals which are received after the
cutoff will not be accepted and considered. The identification number
SSELECDSG-96-1 AND N63387-96-D-3335 must be cited in Block 2b of the
255. PLEASE SEE FOLLOWING CONTINUATION (0159) Loren Data Corp. http://www.ld.com (SYN# 0011 19960610\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|