COMMERCE BUSINESS DAILY ISSUE OF JUNE 12,1996 PSA#1614SOUTHWESTNAVFACENGCOM (Code 0212), 1220 Pacific Highway, San Diego, CA
92132-5187 Y -- EXTEND BUILDING 226, NEBO AREA, MARINE CORPS BASE, BARSTOW,
CALIFORNIA SOL N68711-95-B-8053 DUE 081296 POC For Plans and Specs info
call 619-532-2082/Contracts Specialist, Rose Hussak/Contracting
Officer, Janet Buyson/For Bid Results call 619-532- 2355.
PRESOLICITATION NOTICE - The work includes the addition of
approximately 2,800 square feet to the east end of Building 226 at
Marine Corps Logistics Base, Barstow, California. Addition to existing
building will contain new office areas, restrooms, breakroom and
incidental related work, complete and ready for use. The following work
may be included under Additive Bid Items of work: New septic system for
existing and new building, and a new electrical transformer system.
--The estimated cost is between $100,000 and $250,000. -- Firm Fixed
Price Contract. -- Contract duration is approximately 120 calendar
days. -- This proposed contract will be unrestricted.--The Standard
Industrial Code is 1542 and the annual size standard is $17 million.
Bidders should request in writing stating IFB number N68711-95-C-8053,
with complete name, address, area code and phone number and whether
bidding as a prime/subcontractor/supplier.--Telephone requests will not
be accepted.--There will be a charge for plans and specs that is yet to
be determined. This fee will be non-refundable.--Mail requests with a
check payable to DEFENSE PRINTING SERVICE to Southwest Division, Naval
Facilities Engineering Command (Plan Issue), 1220 Pacific Highway,
Bldg. 132, San Diego, CA 92132-5187.--Fax requests will be accepted
but, WILL NOT be processed until your check has been received by this
office, fax 619-532-2083.--Submit one (1) check per
project.--Solicitation packages are limited to two (2) sets per prime
and one (1) set per subcontractor/supplier.--Bidders responding under
this advertisement will not be required to resubmit request once
formally advertised.--Tentative issue date is on or about 10 July 1996
with an opening date of approximately 30 days later (NOTE: BOD stated
above is TENTATIVE).--Responses are due no later than 15 calendar days
after publication of the advertisement in the CBD. (0162) Loren Data Corp. http://www.ld.com (SYN# 0079 19960611\Y-0003.SOL)