COMMERCE BUSINESS DAILY ISSUE OF JUNE 14,1996 PSA#1616SOUTHWESTNAVFACENGCOM (Code 0211), 1220 Pacific Highway, San Diego, CA
92132-5187 C -- A-E SERVICES AND PLANS AND SPECIFICATIONS FOR FY 1996 SOF PROJECT
P-653, CONSTRUCT MARK V WATERFRONT OPERATIONS SUPPORT FACILITY, NAVAL
AIR STATION, NORTH ISLAND (NASNI), SAN DIEGO, CALIFORNIA SOL
N68711-96-C-2198 DUE 071796 POC Cassey Sheppard/Contract Specialist,
(619) 532-1198, Nancy Trent/Contracting Officer, (619) 532-2853. Firm
Fixed Price. Architect-Engineer services are required for the
preparation of engineering documentation and the design of and
preparation of plans and specifications for the purpose of bidding and
construction for a new 7,342 square meter two-story waterfront
building which comprises a 6,897 square meter boat (57 ton craft)
operations/warehouse and maintenance/repair area with high-bay
construction and cranes, a 91 square meter armory, and a 354 square
meter administrative area, including plumbing, associated utility
connections, heating/ventilating system, air-conditioning system,
electrical system with lighting distribution, fire protection system,
telecommunications, energy conservation features, locker rooms, storm
drainage, parking areas with handicapped requirements, sidewalks,
concrete apron, site developments, demolition of three buildings, and
asbestos/lead paint abatement. Specifications will be required in the
SPECSINTACT format. The estimated start date is September 1996. The
estimated design completion date is September 1997. The contract will
be negotiated on the basis of both engineering documentation and design
services and awarded for 45% design only with an option available to
the Government to award remaining design services at a later date. Only
authority for synopsis, slate, and selection is available at this time.
The estimated construction cost is between $5,000,000 and $10,000,000.
A-E Selection criteria will include (in order of importance): (1)
Recent specialized experience of the firm (including consultants) in
the design of new construction of waterfront facilities for 9- 25 meter
boat operations, storage, maintenance, and repair including high-bay
construction and cranes, armories, administrative spaces with interior
design, energy efficient features, and demolition with asbestos/lead
paint abatement. Do not list more than a total of 10 projects in block
8. Include point of contact name and telephone number in block 8c for
each project listed. Indicate which consultants from the proposed
team, if any, participated in the design of each project. (2)
Professional qualifications of the staff to be assigned to this project
in design of new waterfront facilities for 9-25 meter boat operations,
storage, maintenance, and repair including high- bay construction and
cranes, armories, administrative spaces with interior design, energy
efficient features, and demolition with asbestos/lead paint abatement.
List only the team members who actually will perform major tasks under
this project and qualifications should reflect the individual's
potential contributions to this project. (3) Past performance on
contracts with government agencies and private industry in terms of
cost control, quality of work and compliance with performance
schedules. Indicate by briefly describing internal quality assurance
and cost control procedures and indicate team members who are
responsible for monitoring these processes. List recent awards,
commendations and other performance evaluations (do not submit copies).
(4) Location in the general geographic area of the project and
knowledge of the locality of the project, provided that the application
of this criterion leaves an appropriate number of firms given the
nature and size of this project. (5) Capacity to accomplish the work in
the required time. Indicate the firms present workload and the
availability of the project team (including consultants) for the
specified contract performance period and indicate specialized
equipment available and prior security clearances. (6) List the small
or disadvantaged or woman-owned business firms used as primary
consultants or as subconsultants. If a large business concern is
selected for this contract, they will be required to submit a
subcontracting plan that should reflect a minimum 5% Small
Disadvantaged Business of the amount to be subcontracted out. Those
firms which meet the requirements described in this announcement and
wish to be considered, must submit one copy each of a SF 254 and a SF
255 for the firm and a SF 254 for each consultant listed in block 6 of
the firms SF 255. One copy of the submittal package is to be received
in this office no later than 3:00 P.M. Pacific Time on the due date
indicated above. Should the due date fall on a weekend or holiday, the
submittal package will be due the first workday there after.
Submittals received after this date and time will not be considered.
Additional information requested of applying firms: indicate
solicitation number in block 2b, CEC (Contractor Establishment Code)
and/or Duns number (for the address listed in block 3) and TIN number
in block 3, telefax number (if any) in block 3a and discuss why the
firm is especially qualified based on the selection criteria in block
10 of the SF 255. For firms applying with multiple offices, indicate
the office which completed each of the projects listed in block 8 and
list which office is under contract for any contracts listed in block
9. Use block 10 of the SF 255 to provide any additional information
desired. Personal interviews may not be scheduled prior to selection of
the most highly qualified firm. SF 255's shall not exceed 30 printed
pages (double sided is two pages/organizational charts and photographs
excluded, exception: photographs with text will be considered as a
page). All information must be included on the SF 255 (cover letter,
other attachments and pages in excess of the 30 page limit will not be
included in the evaluation process). Firms not providing the requested
information in the format (i.e. listing more than a total of 10
projects in block 8, not providing a brief description of the quality
control plan, not listing which office of multiple office firms
completed projects listed in block 8, etc.) directed by this synopsis
may be negatively evaluated under selection criteria (3). Firms, their
subsidiaries or affiliates, which design or prepare specifications for
a construction contract or procurement of supplies cannot provide the
construction or supplies. This limitation also applies to subsidiaries
and affiliates of the firm. This is not a request for proposal.
Telegraphic and facsimile SF 255's will not be accepted. Site visits
will not be arranged during the submittal period. See Numbered Note(s):
24. (0164) Loren Data Corp. http://www.ld.com (SYN# 0015 19960613\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|