|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 20,1996 PSA#1620Officer in Charge of NAVFAC Contracts; P. O. Box 54306; NAVSUPPACT
Memphis; Millington, TN 38054-0306 Z -- INTERIOR AND EXTERIOR PAINTING OF VARIOUS BUILDINGS AT NSA
MEMPHIS, MILLINGTON, TN Sol. N62467-96-B-5281. Due 080896. Contact,
Dolores Quinton (901) 873-5061), Contracting Officer, Gary Busby,
(901-873-5061). Furnish all labor, tools, incidental engineering,
equipment, transportation and supervision necessary to provide the
preparation of surfaces for, and the interior and exterior painting of
portions of various buildings, all as designated by Delivery Orders
that will be issued to the Contractor for a period not to exceed one
year from the date of the contract award. The Government may exercise
a second year option on this contract. The Davis Bacon wage rate will
not be adjusted in the option year. In addition to the normal surface
preparation required for painting, preparation of surfaces shall also
include: the replacement of rotted or otherwise deteriorated or missing
wood such as fascia boards, corner boards, window and door trim, etc.,
where these items are to be painted; replacing broken, missing, or
damaged exterior siding where these items are to be painted, and
patching surfaces to be painted such as concrete, concrete block
plaster, and wallboard. The Contractor will be required to remove and
replace all building screens, window guards, storm windows, removable
signs and building numbers, unless directed otherwise, (when these
items occur over surfaces to be painted). All building signs and
numbers that are painted on structures are to remain intact and no
repainting of these signs and numbers is required. This work will also
include the surface preparation and painting of nonfriable cement
asbestos shingle siding. The contract also includes the requirement to
provide new cement asbestos siding shingles to replace missing cement
asbestos siding shingles. However, removal of damaged/deteriorated
cement asbestos siding shingles is not part of this contract. The
removal of damaged/deteriorated cement asbestos siding shingles will be
accomplished by others. The voids where siding shingles have been
removed will be considered ``missing siding shingles'' and providing
new cement asbestos siding shingles for these areas is a part of this
contract. Time for completion is twelve (12) months. This solicitation
will issue on or about July 9, 1996. (166) Loren Data Corp. http://www.ld.com (SYN# 0211 19960619\Z-0008.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|