Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 20,1996 PSA#1620

Officer in Charge of NAVFAC Contracts; P. O. Box 54306; NAVSUPPACT Memphis; Millington, TN 38054-0306

Z -- INTERIOR AND EXTERIOR PAINTING OF VARIOUS BUILDINGS AT NSA MEMPHIS, MILLINGTON, TN Sol. N62467-96-B-5281. Due 080896. Contact, Dolores Quinton (901) 873-5061), Contracting Officer, Gary Busby, (901-873-5061). Furnish all labor, tools, incidental engineering, equipment, transportation and supervision necessary to provide the preparation of surfaces for, and the interior and exterior painting of portions of various buildings, all as designated by Delivery Orders that will be issued to the Contractor for a period not to exceed one year from the date of the contract award. The Government may exercise a second year option on this contract. The Davis Bacon wage rate will not be adjusted in the option year. In addition to the normal surface preparation required for painting, preparation of surfaces shall also include: the replacement of rotted or otherwise deteriorated or missing wood such as fascia boards, corner boards, window and door trim, etc., where these items are to be painted; replacing broken, missing, or damaged exterior siding where these items are to be painted, and patching surfaces to be painted such as concrete, concrete block plaster, and wallboard. The Contractor will be required to remove and replace all building screens, window guards, storm windows, removable signs and building numbers, unless directed otherwise, (when these items occur over surfaces to be painted). All building signs and numbers that are painted on structures are to remain intact and no repainting of these signs and numbers is required. This work will also include the surface preparation and painting of nonfriable cement asbestos shingle siding. The contract also includes the requirement to provide new cement asbestos siding shingles to replace missing cement asbestos siding shingles. However, removal of damaged/deteriorated cement asbestos siding shingles is not part of this contract. The removal of damaged/deteriorated cement asbestos siding shingles will be accomplished by others. The voids where siding shingles have been removed will be considered ``missing siding shingles'' and providing new cement asbestos siding shingles for these areas is a part of this contract. Time for completion is twelve (12) months. This solicitation will issue on or about July 9, 1996. (166)

Loren Data Corp. http://www.ld.com (SYN# 0211 19960619\Z-0008.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page