Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 25,1996 PSA#1623

1443 Reilly Road, Suite C Pope AFB, NC 28308-2896

Z -- CONSTRUCT INTERIM ECM POD FACILITY, PROJECT NO.TMKH 95-1019 SOL F31601-96-B0018 DUE 082796 POC Mr Thomas W. Foster, 910-394-6276, Contracting Officer, Mr Martin M. Honan, Jr, 910-394-6599. The project consists of the construction of a pre-engineered metal building complete with site work. Construction required includes general site work, structural steel construction, miscellaneous steel work, rough and finish carpentry, signage, fire alarm, plumbing, heating, ventilation and air conditioning, electrical power lighting and auxiliary systems work, and other trades as indicated in the solicitation documents. The magnitude of the project is $250,000.00 to $500,000.00. The contract performance period for this project is 180 days after Notice to Proceed, this period includes weather days. All responsible offerors may submit an offer which will be considered by the agency. Only written requests for the invitation for bid packages will be acknowledged. (0173)

Loren Data Corp. http://www.ld.com (SYN# 0156 19960624\Z-0055.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page