|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 26,1996 PSA#1624Colorado Plateau SSO Contracting, 12795 W Alameda Parkway, Lakewood CO
80228 Y -- MAINTENANCE BUILDING ADDITION CAPITAL REEF N.P. UTAH SOL IFB
1270-96-024. Due 081596. POC Mary Sampson, 303/969-2750, Contract
Specialist, James D Clark, Contracting Officer. The work of this
contract consists of the general construction of an addition to an
existing maintenance building located within an administration and
operations compound at Capitol Reef National Park, Utah, which is 10
miles east of Torrey, Utah in the south-central part of the state, off
State Highway 24. The 48 x 97 foot addition shall be constructed using
structural stress skin sandwich panels at exterior walls,
premanufactured wood trusses and a slab-on-grade foundation system. The
structure will support the functions of vehicle maintenance, carpentry
shop and offices for the maintenance staff. The offices are expected
to be a phased, development within the addition. Connection to existing
facilities and utilities, concrete aprons, and site grading are a part
of the work. For a copy of the solicitation fax to 303-969-2750, Attn:
Mary Sampson. (173) Loren Data Corp. http://www.ld.com (SYN# 0152 19960625\Y-0026.SOL)
Y - Construction of Structures and Facilities Index Page
|
|