COMMERCE BUSINESS DAILY ISSUE OF JUNE 28,1996 PSA#1626U.S. Army Engineer District, Savannah, 100 W. Oglethorpe Avenue,
Savannah, GA 31402 C -- ADAL JSTARS UTILITIES - ROBINS AFB, GEORGIA POC Derek Cudd at
912/652-5688. 1. CONTRACT INFORMATION: AE services are required for
site investigation, planning, engineering studies, concept, and final
design (option), and services during construction. This will be a firm
fixed price contract. The contract is anticipated to be awarded in
August 1996 and completed in June 1997. The estimated construction cost
range is less than $5,000,000. This announcement is open to all firms,
regardless of size. Large business offerors must identify
subcontracting opportunities with small business, and small
disadvantaged business on SF 255. 2. PROJECT INFORMATION: The work
shall consist of performing all Architect-Engineer services necessary
in preparation of plans, specifications, design analysis, and cost
estimates for the design related to Upgrade/reconfigure JSTARS utility
system, including associated switchgear, cables, and protection to
form a complete looped distribution system. Expand/repair parking and
secondary road support system. Provide area parking, site work,
associated fencing, street lighting, road repair/overlay, sidewalks,
landscaping, dormitory parking, and utility support for security
system. 3. SELECTION CRITERIA: See Note 24 for general A-E selection
process. The selection criteria are listed below in descending order of
importance (first by major criterion and then by each sub-criterion).
Criteria a-e are primary. Criteria f-g are secondary and will be used
only as ''tie-breakers'' among technically equal firms. PRIMARY
CRITERIA: a. Specialized experience and technical competence in: (1)
Design upgrade of electrical distribution and switchgear systems; (2)
Design upgrade of roadways and parking areas; (3) Design of security
fencing and utility support for alarm systems; (4) Use of CADD; (5) Use
of MCACES Gold. The estimates for this project shall be prepared using
the latest version of MCACES Gold Software. The software and User's
Manual will be provided by the Savannah District free of charge to the
successful A-E. The drawings will be prepared using graphics created
via Intergraph/Bentley Microstation PC Version 5.0 or later or
Microstation 32. Drawings created using other CADD software must be
translated to the Microstation (*.dgn) format. The Contractor will
possess the software to enable the full translation of drawing files.
Before selection, the pre-selected A-E's may be required to demonstrate
the above compatibility by reproducing a Government-supplied standard
drawing and translating it to the Intergraph/Bentley Microstation
format with proper leveling, line weights, symbology, color, etc., as
described in EM 1110-1-1807. Compliance with this requirement will be
submitted as part of the SF 255 submittal. The specifications will be
produced in Microsoft Word using Corps of Engineers Military
Construction Guide Specifications. The A-E firm will be required to
submit a Design Quality Assurance Plan concurrently with their fee
proposal. Information on what is to be contained in this plan will be
furnished upon notification of selection. Firms responding to this
announcement are requested not to transmit this plan with their SF 255.
The specifications will be produced in SPECINTACT using Corps of
Engineers Military Construction Guide Specifications. The responses to
design review comments will be provided on Corps of Engineers
Automated Review Management Systems (ARMS) (software provided); b. Past
performance on DoD and other contracts with respect to cost control,
quality of work, and compliance with performance schedules; c. Capacity
to accomplish the work in the stated contract period and to dedicate at
least 1 structural engineer, 2 electrical engineers, 2 civil engineers,
1 mechanical engineer, and 1 topo survey crew. The design team must
include a Registered Engineer or Registered Architect who is a full
''member'' in good standing of the Society of Fire Protection Engineers
(SFPE) or an individual who is a Registered Fire Protection Engineer
and whose principle duties are fire protection engineering; d.
Professional qualifications of key management and professional staff
members; e. Knowledge of the locality as it pertains to design and
construction methods used for projects in the geographic area of this
project. SECONDARY CRITERIA: f. Extent of participation of SB, SDB, WO,
historically black colleges and university and minority institutions in
the proposed contract team, measured by percentage of the estimated
effort; g. Volume of DoD contract awards in the last 12 months as
described in Note 24. 4. SUBMITTAL REQUIREMENTS: See Note 24 for
general submission requirements. Interested firms having the
capabilities to perform this work must submit one (1) copy of SF 255
(11/92 edition) for PRIME and one (1) copy of SF 254 (11/92 edition)
for prime firm and all consultants, to the U.S. Army Engineer District,
Savannah, ATTN: CESAS-EN-EA, 100 W. Oglethorpe Avenue, Savannah, GA
31401-3640 by 29 July 1996 to be considered for selection. Include the
firm's ACASS number on the SF 255, Block 3b. For ACASS information,
call 503/326-3459. DEPTH OF PRIME AND SUBCONTRACTOR PERSONNEL IN EACH
DISCIPLINE MUST BE SHOWN IN BLOCK 4 OF SF 255 AND SF 254 TO CLEARLY
IDENTIFY THE NUMBER OF PERSONNEL IN EACH FIRM AND DISCIPLINE. Cover
letters and extraneous materials are not desired and will not be
considered. Phone calls are discouraged unless absolutely necessary.
Personal visits for the purpose of discussing this announcement will
not be scheduled. This is NOT a REQUEST FOR A PROPOSAL. (0178) Loren Data Corp. http://www.ld.com (SYN# 0025 19960627\C-0009.SOL)