|
COMMERCE BUSINESS DAILY ISSUE OF JULY 3,1996 PSA#1629Operational Contracting Office, 100 Logistics Dr., 2nd Flr, Suite 200,
Westover ARB, Chicopee, MA 01022-1531 J -- REPLACE REFRACTORY AND THIRTEEN BOILER TUBES FOR CENTRAL HEAT
PLANT SOL F1961796T2270 and F1961796T2271. DUE 080796. Contact Hank
Lemanski or Michael I. LaFortune, Contracting Officer at 413/557-2493.
Furnish all labor, materials, equipment, and supervision to provide
boiler repair services for Heat Plant B-1411 at Westover ARB, MA.
Replace refractory in floor, rear wall and burner cone in Boilers 1 and
2. Replace 13 tubes in boiler 1. One job, to be completed within 30
days from award. Solicitation issue date approximately 24 Jul 96.
Standard Industrial Class Code for this project is 7699. Project is
100% small business set-aside. Telephone requests WILL NOT be honored.
Interested firms may request an IFB package by submitting a written or
FAX request to the above address. The FAX number is (413)557-2017. RFQ
will be furnished to each bidder without charge and will also be
available for examination at Operational Contracting Office, 100
Logistics Dr., 2nd Flr., Suite 200, Westover ARB, Chicopee, MA
01022-1531. (176) Loren Data Corp. http://www.ld.com (SYN# 0071 19960702\J-0013.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|