COMMERCE BUSINESS DAILY ISSUE OF JULY 3,1996 PSA#1629USAED, SACRAMENTO, CONTRACTING DIVISION, 1325 J STREET, SACRAMENTO CA
95814-2922 Y -- CONSOLIDATED MATERIAL PROCESSING FACILITY, DAVIS-MONTHAN AFB,
ARIZONA SOL DACA05-96-R-0033 DUE 092396 POC Plan Room Fax:
(916)557-7842. Contract Specialist Tricia Christie (916)557-5228 and
Fax (916)557-7854. Contracting Officer Ronald J. Miller. (Site Code
DACA05) Provide for the construction and related necessary design of a
Consolidated Material Processing Facility. Project includes a 2,800
S.M. Material Processing Facility (without storage features) with an
uncovered loading dock and an 850 S.M. Administration/Automatic Data
Processing Facility; both facilities attached by a common wall.
Construction will consist of concrete foundation and slab, split-face
concrete masonry unit walls (with metal siding above CMU), structural
steel trusses with sloped standing seam metal roofing over. Loading
platforms/ramps, communications pre- wiring, computer support
facilities, utilities, desert landscaping, paving, HVAC, EMCS, fire
protection, pre-wired workstations, Comprehensive Interior Design
Package, interior finishes and demolition of twelve existing buildings
are also included. This procurement will be conducted under SIC
code:1542. The size standard for this SIC code is: $17.0 million. This
is a design/build project; the offeror chosen will complete the design
and construct the facility. The acquisition method is negotiated
procurement. A technical and cost proposal will be required. Evaluation
by the Government will result in selection of a firm that represents
the best value to the Government. Large businesses competing for this
project must comply with the FAR 52.219-9 clause regarding the
requirement for a subcontracting plan on the part of the work it
intends to subcontract. The recommended goals for subcontracting are
52.5% for small business, 8.8% for small disadvantaged business, and
3.0% for small business/woman-owned. A firm that submits a plan with
lesser goals must submit written rationale to support goals submitted.
Estimated cost is between $5,000,000 and $10,000,000. The award of
this project is subject to availability of funds. Plans and
specifications for this project must be ordered by the CUT OFF DATE of
01 Aug 96 to ensure receipt of bid sets at a cost of $35.00 for
specifications (text only); and $11.00 for full size drawings. Orders
received beyond the CUT OFF DATE will not be honored. Plans and
specifications will be mailed out on or about 09 Aug 96. Because a
limited number of sets will be reproduced, copies are limited to one
set per firm. Payment by company check, certified check or money order
made payable to the Finance and Accounting Officer, USAED, Sacramento,
must be received prior to issuance of your order (payment is
non-refundable). Payment must be submitted with order request or
delivered in person to USAED, Sacramento, ATTN: Plan Room, 1325 J
Street, Sacramento, CA 95814-2922. Do not address to the contract
specialist for this will delay your order. Firms are requested to
provide their name, street and mailing address, telephone and FAX
numbers and the solicitation number of the project. All responsible
sources may submit a proposal which will be considered by the agency.
See Note 26.(0183) Loren Data Corp. http://www.ld.com (SYN# 0168 19960702\Y-0004.SOL)