COMMERCE BUSINESS DAILY ISSUE OF JULY 8,1996 PSA#1631General Services Administration (8PM),Public Buildings Service,P. O.
Box 255 46,Denver,CO 80225-0546 Z -- REPLACE CHILLER, FB/CT, RAPID CITY, SD SOL GS-08P-96-JCC-0010 DUE
092696 POC Contact,Alison Sullivan,303/236-1770 SIC Code 1711. Scope of
work: Remove existing absorption chiller; replace with mechanical
(direct expansion-DX) chiller; replace chilled water pumps. Remove
existing cooling tower; replace with two new cooling towers; replace
condensor water pumps. Abate asbestos containing thermal insulation
materials on steam and chilled water piping. Replace constant volume
reheat system on the second floor with a variable air volume system;
VAV system controls shall be microprocessor-based direct digital
controls (DDC). Improve zoning of perimeter baseboard heating on all
floors. OPTION NO. 1: Install an Energy Management Control System
(EMCS); EMCS shall extend to chiller and boiler plant and system level
(air handling units) HVAC equipment. Estimated cost range is $500,000
to $1,000,000. The pre-solicitation notice will be issued o/a
07/05/96. Plans and specifications may be requested at this time;
however documents will not be available until o/a 08/27/96 (IFB date).
Bid opening o/a 09/26/96. This procurement is open to both small and
large business concerns under the Small Business Competitiveness
Demonstration Program. Requests for plans and specifications must be
submitted IN WRITING to the GSA Business Service Center (8PB-B), P.O.
Box 25006, Denver, CO 80225-0006; FAX (303) 236-7403. (0185) Loren Data Corp. http://www.ld.com (SYN# 0204 19960705\Z-0043.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|