|
COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1996 PSA#1635USDA Forest Service, 701 Camino Del Rio, Durango, CO 81301 Y -- BEAVER CREEK BRIDGE SOL R2-09-96-57 DUE 082896 POC Contact Roxann
Holman, 970/385-1242, Contracting Officer Joe Milburn 970/385-1245 This
project includes replacing the super structure of the Beaver Creek
Bridge on the Dolores-Norwood Ranger District with a steel bridge super
structure, including guardrail, road approaches, signs, hot bituminous
asphalt approaches and deck surface, removal and disposal of existing
steel bridge super stucture, mobilization, detour barricades and
traffic control, seeding and clean up. The project can be located by
FDR 526, Dolores-Norwood Road, 19 miles northeast to Beaver Creek
Bridge. Cost estimate is between S25,000 and S100,000 and contract time
is 30 calendar days. (0192) Loren Data Corp. http://www.ld.com (SYN# 0090 19960711\Y-0015.SOL)
Y - Construction of Structures and Facilities Index Page
|
|