|
COMMERCE BUSINESS DAILY ISSUE OF JULY 16,1996 PSA#1637Contracting Officer, Coconino National Forest, 2323 E. Greenlaw Lane,
Flagstaff, AZ 86004-1890 Y -- BELL ROCK PATHWAY, TRAIL CONSTRUCTION, TEMPORARY PARKING AREA Sol
IFB R3-04-96-07 due 080896 Contact Contracting Office Yolanda B.
Mitchell at (520) 527-3540 Bell Rock Pathway, Coconino National Forest,
Sedona Ranger District, Sedona, AZ. The Invitation For Bid is to
construct a 3.5 mile pathway consisting of clearing and grubbing;
excavation with some borrow material required; the construction of
rock-filled gabion and dry masonry rock retaining walls; installation
of culverts; 3 multi-plate metal box culverts and the installation of
a trail bridge, prefabricated with steel stringer and treated wood
deck; application of soil treating compound to consolidate and harden
finished grade; seeding slopes and other disturbed areas. Construction
of a temporary parking area approximately one half (1/2) acre.
Includes moving highway right away fence and minor clearing and
grading. The project is located in a highly sensitive ecological area,
where ground disturbing activities will be required to be confined to
within the construction limits and areas designated and approved for
construction related activities. Issue Date; July 10, 1996, Bid
Opening; August 08, 1996, 2:00 P.M. local time. For technical
assistance call Larry Pokorny at 520-527-3577 or Contracting Officer at
(520) 527-3540. Price range $250,000 to $500,000. (190) Loren Data Corp. http://www.ld.com (SYN# 0145 19960715\Y-0021.SOL)
Y - Construction of Structures and Facilities Index Page
|
|