COMMERCE BUSINESS DAILY ISSUE OF JULY 24,1996 PSA#1643Commanding Officer, Engineering Field Activity West, 900 Commodore Dr.
San Bruno, CA 94066-5006 Y -- BACHELOR ENLISTED QUARTERS (BEQ), (PHASE III), FY96 MCON PROJECT
P-488 AT THE NAVAL CONSTRUCTION BATTALION CENTER, PORT HUENEME,
CALIFORNIA SOL N62474-94-B-7516 DUE 091296 POC Teresa Marshall,
Contract Specialist, Code 02T1TM, (415) 244-2699 (FAX) or Carl
Brinkley, Contracting Officer. This project consists of two parts (PART
''A'' and PART ''B''). PART ''A'' will include Base Bid Item 0001 with
option, and PART ''B'' will be additional Option Items. The Government
reserves the right to exercise any or all of these options within 120
days after the date of the Notice to Proceed. PART ''A'' work includes
the furnishing of all labor, materials, and equipment required to
construct the BEQ Building (South Wing and South Half of East Wing) and
Activity Building including demolition of buildings, paving, walks,
trees and shrubs, underground utilities and the removal and disposal of
asbestos containing materials (ACM) and lead paint containing materials
and incidental related work. The BEQ Building is a three-story
dormitory constructed of concrete floors and roof slabs and concrete
masonry walls, and interior metal frame partitions, and interior
finishes. The spaces included are living/sleeping room spaces,
electrical, mechanical, housekeeping rooms and mechanical chases. The
Activity Building is a one-story building constructed of concrete floor
slabs, masonry walls, structural steel roof framing, metal deck and
interior finishes. The spaces included are lobby, lounges, exercise
room, managers office, handicapped accessible restrooms, storage rooms,
and self-service laundry. Construction site utilities include
electrical distribution and lighting, telephone, sewer, water, gas,
pre-protection, and provisions for future expansion of the BEQ
Building. Construction site improvements include walks, patios, outdoor
barbecue grills, benches, walls, landscaping, and irrigation. PART
''B'' (an Option Item) includes the furnishing of all labor materials,
and equipment required for minor demolition of paving, walks, trees
and shrubs, and portions of concrete masonry building wall, and the
expansion of existing building including the North Wing and North half
of East Wing. BEQ Building expanded wings are constructed of concrete
floors and roof slabs and concrete masonry walls, and interior metal
frame partitions, and interior finishes. The spaces included are
living/sleeping rooms spaces, electrical, mechanical, housekeeping
rooms, and mechanical chases, and insulation bulk storage rooms with
electrical, mechanical, and plumbing rough-ins for potential future
construction to living/sleeping modules. Construction site improvements
includes walks, landscaping, and irrigation. Estimated Construction
Cost over $10,000,000. Firm-Fixed-Price Contract. The proposed contract
is UNRESTRICTED. Contract duration is approximately 540 calendar days.
The Standard Industrial Code (SIC) is 1522 and the related small
business standard is $17,000,000. Bidders shall request a copy of the
solicitation in writing stating IFB Number N62474-94-B-7516 with
complete company name, address, area code, business phone and FAX
number and whether bidding as a prime, subcontractor, or supplier.
TELEPHONE REQUESTS WILL NOT BE ACCEPTED. FAX REQUESTS TO (415)
244-2699, or mail requests to Engineering Field Activity, West, Attn:
Code 02T1, 900 Commodore Drive, San Bruno, CA 94066-5006. Plans and
specifications will be available on or about 12 August 1996 and will be
issued on a first come first served basis until supply is exhausted. No
deposit required. All qualified, responsible sources may submit a bid
which shall be considered by this agency. (0204) Loren Data Corp. http://www.ld.com (SYN# 0137 19960723\Y-0002.SOL)
Y - Construction of Structures and Facilities Index Page
|
|