|
COMMERCE BUSINESS DAILY ISSUE OF JULY 29,1996 PSA#1646U.S. Army Engineer District, Rock Island, Corps of Engineers, Clock
Tower Building, P.O. Box 2004, Rock Island, Illinois 61204-2004 Z -- REPAIR CONCRETE NEW SECTION, BUILDING NO. 160, PR NO. 100-91 AND
PR NO. 54-95, ROCK ISLAND ARSENAL, ROCK ISLAND, ILLINOIS SOL
DACA25-96-B-0041 DUE 091896 POC Contact Jan Krahl, 309/794-5314/
Contracting Officer Barbara Morgan, 309/794-5486 This project consists
of removal and replacement of concrete on upstream and downstream
retaining walls, seal large vertical crack in downstream retaining
wall, remove and replace concrete in the spillway (walls, floor, and
ceiling), remove andreplace concrete on wall of powerhouse, clean
erosion and undermined areas on downstream side of powerhouse and fill
with concrete, removal of bulkhead storage structure, and fabrication
and installation of new bulkhead. Specifications including bidform and
half size drawings will be furnished at a cost of $12.50; full size for
$31.25. The estimated magnitude of the proposed procurement is between
$500,000 and $1,000,000. All responsible sources may submit an offer
which shall be considered.The SIC code for this solicitation is 1541.
(0207) Loren Data Corp. http://www.ld.com (SYN# 0218 19960726\Z-0064.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|