COMMERCE BUSINESS DAILY ISSUE OF JULY 30,1996 PSA#1647Acquisition Management Dept, Bldg 54, National Naval Medical Center,
Bethesda MD 20889-5600 65 -- RENOVATION OF ANIMALS WATERING SYSTEM SOL N6422396RC00104. Due
080596. POC Contracting Officer Mary A Lutton, 301/295-6491. Renovation
of animal watering system, includes upgrading, repairing and adding to
the existing animal watering system located at the Naval Medical
Research Laboratory, Bethesda MD. Work to include: 1. Renovation work
on the first floor: A. Replace Pressure Reducing Station in room #113
with new Pressure Reducing Station. B. Replace 15 ft section of CPVC
Pipe in Room #113, C. Repair 8 ft section of CPVC Pipe in Room #127 and
D. Install Pressure Reducing Station in Room #112. Install CPVC pipe
with (10) Interconnect Stations each equipped with stainless steel
disconnect couplings. 2. Renovation work on the Basement Floor: A.
Replace Pressure Reducing Station in Room #2. B. Replace CPVC Pipe with
(10) Interconnect Stations each equipped with a poly hose for stainless
steel quick disconnect coupling. C. Replace Pressure Reducing Station
in Room #3B. D. Remove and replace CPVC Pipe with (9) Interconnect
Stations each with stainless steel quick disconnect couplings. All CPVC
piping and mounting hardware included. (Room #3B). E. Remove and
replace Pressure Reducing Station in Room #5 with (8) Interconnect
Stations each equipped with a poly hose with stainless steel quick
disconnect couplings. All CPVC piping and mounting hardware shall be
included. F. Replace Pressure Reducing Station in Room #7. Replace CPVC
pipe in room #7. G. Replace Pressure Reducing Station in Room #9.
Replace 7 ft section of CPVC piping. H. Install Pressure Reducing
Station in room #11. Install CPVC piping with (10) Interconnect
Stations with stainless steel quick disconnect couplings. All CPVC
piping and mounting hardware will be included. Requirements:
Interconnect Stations each equipped with recoil hose with stainless
steel quick disconnect couplings. This includes all wall-mounted piping
and fittings, 1/2'' plastic stand-offs and stainless steel mounting
hardware. Manual Flush Valves at terminal end of distribution system
with an extension of the CPVC piping to sink within the animal room, or
as designated. Special Requirements: Manifolds must be 1/2'' 316 grade
stainless steel pipes. All components must be ``electro-polished'' and
``passivated''. This equipment stands up to acidified or chlorinated
water. All bedding proof water ``Valves'' must be ``electro-polished''.
Requirements of each pressure reducing station include: must have check
valves on the low side - prevents a backflow, silicone rubber inside
the regulator, stainless steel components inside the pressure station
and all stainless steel parts to be ``electro-polished''. This
precludes any reaction with chlorine. All responsible sources may
submit an offer which will be considered. This is a Simplified
Acquisition procurement. (204) Loren Data Corp. http://www.ld.com (SYN# 0495 19960729\65-0002.SOL)