COMMERCE BUSINESS DAILY ISSUE OF JULY 31,1996 PSA#1648USDA-NATURAL RESOURCES CONSERVATION SERVICE, 101 SOUTH MAIN STREET,
TEMPLE, TX Y -- BIG SANDY CREEK WATERSHED TWO FLOODWATER RETARDING STRUCTURES SOL
NRCS-14-TX-96 DUE 091096 POC Geoben A. Johnson, Contracting Officer
This project is for the construction of two flood water retarding
structures in the Big Sandy Creek Watershed, Sites 14A and 27. They
consist of rolled compacted earth fill embankments, open channel
emergency spillways, and precast concrete principal spillway conduit
with concrete inlet towers and concrete outlet works. Major items of
work: Site 14A - 31,740 cu yds of compacted jor items of work: Siearth
fill, 67,950 cu yds of both common and unclassified excavation, 39.8
cu yds of concrete, 240 lin ft of 18 inch concrete pressure pipe, the
installation of 600 lin ft of soil-bentonite slurry trench, and the
placement of 714 cu yds of graded drain fill. Site 27 - 107,000 cu yds
of compacted earth fill, 15,300 cu yds of both common and unclassified
excavation, 49.7 cu yds of concrete, 210 lin ft of 24 inch concrete
pressure pipe, the installation of 800 lin ft of soil-bentonite slurry
trench, the installation of a well and/or well point system, and the
placement on of a well and/or weof 2,165 cu yds of graded drain fill.
Estimated Price Range is between $500,000 and $1, (0211) Loren Data Corp. http://www.ld.com (SYN# 0148 19960730\Y-0035.SOL)