Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF AUGUST 2,1996 PSA#1650

US ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT, Attn: CENAN-CT, 26 Federal Plaza, Rm 1843, New York, N.Y. 10278-0900

Y -- UPGRADE ELECTRICAL DISTRIBUTION PHASE II, PICATINNY ARSENAL, DOVER NEW JERSEY. SOL DACA51-96-B-0061 DUE 091996 POC Mabel Thompson, Contract Specialist 212-264-6706. The subject projects consists of new 34.5/12.47 KV Substation, two 3750 KVA transformers. Upgrade of aproximately 12 miles of 2.4 KV distribution line to 12.47 KV distribution including switching 3 wire system to new 4 wire grounded system, new poles (Approx. 450 poles) and crossars/insulators, existing conductors plus a new natral. Replace approximately 160 2.4 KV primary trasnformer with 12.47 KV primary transformer. Removal of PCB transformers. Demolition of five substation. Additionally, the project includes the installation of a lad shedding system for the purpose of remotely sheeding blocks of selected air phase II covers approximately 1/3 rd of the Arsenal. The construction duration will be 540 days from Notice to proceed. The range of this project is 5 million to 10 million dollars. There is a non-refundable charge of 79.00 dollars for plans and specifications make check payable to FAO, USA, COE, NED and send to US Army Corps of Engineers, 26 Federal Plaza, New York, NY. 10278-0090, Room 1843 ATTN: Mabel Thompson. Plan and specification will be available on or about 19 August 1996. The S.I.C. code for this project is 1623. 19 September 1996 at 2:00pm is the bid opening date for this project in Room 1802, Contracting Office. (0213)

Loren Data Corp. http://www.ld.com (SYN# 0145 19960801\Y-0010.SOL)


Y - Construction of Structures and Facilities Index Page