COMMERCE BUSINESS DAILY ISSUE OF AUGUST 2,1996 PSA#1650Department of the Army, Baltimore District, Corps of Engineers, Room
7000, 10 South Howard Street, P.O. Box 1715, Baltimore, MD 21201-1715 Z -- PROVIDE HEATING AND AIR CONDITIONING SYSTEMS, BUILDING 236, FORT
MYER, ARLINGTON, VA SOL DACA31-96-B-0086 DUE 091696 POC Marie Johnson
at (410) 962-3464 or Betty Schneider at (410) 962-5638 This proposed
procurement unrestricted. Estimated cost of construction is between
$100,000.00 and $250,000.00. Complete no later than 132 calendar days.
Replace two water cooled condensing units and fan coil units with new
chilled water fan coil units. Replace air cooled condensing unit and
air handling unit with associated ductwork at Second Floor with new 40
MBH cooling capacity air handling unit with ductwork. Replace five
electric unit heaters with hot water unit heaters. Provide seven
nominal ton capacity air cooled chiller and pump with chilled water
supply and return piping to each fan coil unit and air handling unit.
Provide 300 MBH capacity steam-to-hot water convertor and hot water
pump with hot water supply and return piping to air handling unit, fan
coil units and unit heaters. All responsible sources may submit a bid
which shall be considered by the agency. Full size plans and specs
$24.00 p/set; half size plans and specs $17.75 p/set; Non-Refundable.
Make check or money order payable to FAO, USAED Baltimore and mail to
the attention of CENAB-CT-EB. No Cash Accepted--Issuance o/a 15 August
1996 bid opening o/a 16 September 1996 (0213) Loren Data Corp. http://www.ld.com (SYN# 0211 19960801\Z-0029.SOL)