COMMERCE BUSINESS DAILY ISSUE OF AUGUST 2,1996 PSA#1650USDA Forest Service, 701 Camino Del Rio, Durango, CO 81301 Z -- MCPHEE/HOUSE CREEK ASPHALT REPAIR SOL R2-09-96-67 DUE 090396 POC
Contact Roxann Holman, 970/385-1242, Contracting Officer Joe Milburn
970/385-1245 This project consists of repairing several locations on an
asphalt paved forest service road. The repairs consist of approximately
877 square yards of asphalt (hot mix) and approximately 22 cubic yards
of -3/4'' base course. The road is a double lane road accessing 2
separate recreation sites. There may be short (15 min.) traffic delays
during the repairs but otherwise the roads need to be kept open to
traffic. The contractor is responsible to furnish and apply the 3''
depth of asphalt and 8'' of compacted gravel base material, all traffic
control devices, and run all controls for quantity and quality tests.
The project can be located from Dolores, Colorado, by taking Forest
Developement Road (FDR) #526 for approximately 7 miles to the junction
of FDR #528. There are 3 repair locations on FDR #528. Road #271 can
be accessed by taking State Highway 145 west from Dolores, Colorado,
for 2 miles to the junction of State Highway 184, then west on 184 for
4 miles to County Road 25 for .3 miles to its junction with FDR 271.
There are approximately 14 repair locations on FDR 271 along with 5
other short camground roads. The government cost estimate is between
S25,000 - S100,000. Contract time is 15 calendar days with start of
work date 9/23/96. (0213) Loren Data Corp. http://www.ld.com (SYN# 0222 19960801\Z-0040.SOL)