|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 29,1996 PSA#1669DEPT OF JUSTICE, FED PRISON INDUSTRIES, 320 1ST STREET NW - Material
Mgt Branch, WASHINGTON, DC 20534-0001 34 -- POWDER COATING SYSTEM -BOOTHS/EQUIPMENT SOL 1PI-R-0587-96 DUE
091396 POC Contract Specialist, MITCHELL, BETH, 202/508-3960 UNICOR
intends to issue a sole source solicitation FOB Destination to UNICOR,
Lewisburg, PA Contract: Firm Fixed Price type contract. Delivery
Schedule: 120 DAYS After contract award date. Description and
Quantities: Powder coating system for (2) each 542S Powder Paint
booths. Each booth will be fitted with manual roll on/roll off line
equipment. this will allow the complete booth, controllers, operator
platforms, and bulk feeders to be moved as oneunit. The first booth in
line will have 4 each manual application stations. The second booth in
line will have 2 each manual application stations, and gun slots for 16
each 8 each side automate guns. These guns will be mounted in a stager
position, 18 inches apart, on oscillators. Oscillation of these
automatics will provide for effective coating area over the entire
profile of the booth. One of each length/type of application gun and
cable will be included as spares. 25 each of plastic wear containers
will be provided as spares. 2 Sets of final filters will be included as
spares. 2 sets of cartridge filters will be included as spares. An
offer of credit on existing booths and related Norson Equipment will be
provided. This will be shown as a deduct on the proposal. The expected
shipping of credited items will be approx. Nov. 1996. Freight charges
will be the responsibility of the vendor. Both Booths will come with
all available quick disconnects to facilitate color module changes
outs. 2 each bulk feed systems will be supplied. 55 gallon fiber type
drum. Preliminary finishing system requirements: All gas heated stages
must be capable of maintaining 160 degrees, based on pasrt through put
as 12 FPM. 1st and 3rd stage will be heated by gas fired emersion tube.
Each stage will have a swing awary dock light. All internal piping and
external piping willbe CPVC. All risers will have cut-off valve and
quick disconnect for removal. An additional 50 replacement nozzle will
be provided with the system. EXisting filter booth will be included to
provide complete and effective ware envelope for the largest existing
part (36'' wide x 87'' high x 10' long. The contractor will be required
to position each nozzle and demonstrate effective pattern. Average part
spec. mtl A36 carbon steel. Avg. construction 1/8'' x 1''x1'' angle and
20 GA. Formed sheet. Max. part size to be 36'' widex87'' highx10' long.
aveg. part weight 50 lbs.. Each stage will be required to maintain 25
psi with minimal to carry over between stages approx. 9ft. per 30 sec.
dute to this operating pressure. Each stage will have pressure
adjustments from 0-25 psi min. pumps are to be sized accordingly. All
heated an unheated stages wil lhve temp probes located in such a manner
that they will read riser discharge effluent withing 5 degrees. The
readouts are for these probes will be 110 vac digital and mounted for
easy viewing. Location fo rreadouts to be determined upon award. Tank
bottoms will have a min. 8 degree slope towards drain to allow for ease
of cleaning. a 3'' drain with sump will also be provided. All steel
tanks and metal piping will be constructed of 304 stainless steel. All
washer housing will be contraucted of composit polypropylene or
stainless steel material. the floor of the Washer will be completely
enclosed gtaring and easily removable for cleaning acccess. No
removalbe section will be weigh in excess of 30lbs. The first stage of
the washer will contain an effective oil skimming system. Motor and
blower will be mounted on washer with no structure extending to the
door. the exit of the washer will contain an effective and Adjustable
air knife system. Washer and oven exhaust venting will meet all factory
manual standards. All roof penetrating will be completed by USP
Lewisburg. provisions of curbs, stacks, and acquisition of EPA and
State forms for permitting will be the responsibility of the
contractor. Permitting will be accomplished in accordance with all
guideline of the state of PA. The disposal of trash and refuge
generated by installation of this system will be the contractors
responsibility. The cleanliness of the installation site will be
maintained daily by the contractor. Line speed will be variable from
0-20 FPM. This will require a new drive unit to be fitted to our 1-beam
conveyor. Line speed based on 12 FPM. USP Lewisburg will provide the
drive unit. 2 each nordson NHC- 524s roll on roll off booths will be
installed by the contractor and USP Lewisburg. A min. of 5 feet between
these booths will be required. Contractor will show this on the layout.
An interlock will be located in line to instruct the cure oven to
recede to low fire when the conveyor stops. the ovens dry off and cure
will be common design with columns of the existing building structure
located within the columns of the existing building structure located
within the confines of the oven. These columns will be insulated to
prevent structural distortion separate burner will be required for each
side. all duct work will be located on the floor on the oven and
assembled of materials capable of supporting 250 lbs. at any location
within the oven or air seals. The oven will be capable of elevator
spec. heights 96'' width 120'' depth 14 feet weight rating 12, 000 lbs.
GAS-3 supply @ 15 psi. no wash tank will penetrate the floor all tanks
will be installed on the third fl. USP Lewisburg will remove the
existing system. The contractor will provide the drawings of conveyor,
utility drop requirements and roof penetrations within 45 days after
award. Approximate bid opening date is 9/13/96. Facsimile requests to
202-508-8498. See Note 22. (0240) Loren Data Corp. http://www.ld.com (SYN# 0171 19960828\34-0001.SOL)
34 - Metalworking Machinery Index Page
|
|