Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 5,1996 PSA#1673

Commanding Officer, Naval Facilities Engineering Command, P. O. Box 190010, North Charleston, SC 29419-9010

Y -- C-17 ADAL APRON/HYDRANT SYSTEM, PHASE III, CHARLESTON, SC SOL N62467-93-B-0763 DUE 102296 POC Technical inquiries prior to bid opening MUST be submitted in writing to the address listed above, or faxed to (803) 820-5853, Attention: Deborah Taylor Code 0212DT. The Contracting Officer for this solicitation is L. C. Millhouse. SOLICITATION NOTICE: THE COST FOR EACH SET OF PLANS AND SPECIFICATIONS IS $80.00. THE POINT OF CONTACT IS RONNIE MITCHUM AT 803/743-4040. THIS CHARGE IS NON-REFUNDABLE. To obtain plans and specifications make company check payable to US Treasuryand send to the DEFENSE PRINTING SERVICE DETACHMENT OFFICE, ATTN: RONNIE MITCHUM, P O BOX 71359, CHARLESTON, SC 29415 OR FOR DIRECT OR EXPRESS MAIL DELIVERY, ADDRESS YOUR REQUEST TO SUITE B 2825 AVENUE D. NORTH CHARLESTON, SC 29408-1802. No telephoneorders can be accepted, however, if problems arise concerning your request, call RONNIE MITCHUM at 803/743-4040. To obtain a plan holders list FAX your request to 803/743-3027. For inquiries about BID OPENING DATE, NUMBER OF AMENDMENTS ISSUED, CONTACTSUSAN CLARK at (803) 820-5775. To obtain bid results, call (803) 820-5922 after 10:00 AM for a pre-recorded message that will be available the day after scheduled bid opening. The demolition work includes removal of existing portland cement concreteand asphaltic concrete pavements; removal of existing fuel system including existing pumphouse with associated pumps, pump control room, valves, vents, piping, underground storage tanks and fire alarm system. New work includes new portland cement andasphaltic concrete pavement; pavement markings; storm water and subsurface drainage systems, new Type III Pressurized Hydrant Fuel System, pumphouse, piping with continuous leak detection, and fire protection; replacement of existing abovegroundairfield lights and new electrical and lighting duct systems. There will be 180 days 5 bid options. Bid Option 1, Demolition of pumpstation #2. Bid Option 2, Demolition of pumpstation #3. Bid Option 3, Construction of all new fire hydrants,associated valves and lateral lines and other miscellaneous waterline work at existing water supply main. Bid Option 4, Construction of new water main and associated fire hydrants, valves, lateral lines and other miscellaneous related work. Bid Option5, Construction of new 120' mast lighting. Except when it is determined in accordance with FAR 17.206(b) not to be in the Governments best interests, the Government will evaluate offers for award purposes by adding the total price for all options tothe total price for the basic requirement. Estimated cost is OVER 10 MILLION. Estimated duration of the contract is 360 calendar days for completion.(0247)

Loren Data Corp. http://www.ld.com (SYN# 0108 19960904\Y-0006.SOL)


Y - Construction of Structures and Facilities Index Page