COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 5,1996 PSA#1673Commanding Officer, Naval Facilities Engineering Command, P. O. Box
190010, North Charleston, SC 29419-9010 Y -- C-17 ADAL APRON/HYDRANT SYSTEM, PHASE III, CHARLESTON, SC SOL
N62467-93-B-0763 DUE 102296 POC Technical inquiries prior to bid
opening MUST be submitted in writing to the address listed above, or
faxed to (803) 820-5853, Attention: Deborah Taylor Code 0212DT. The
Contracting Officer for this solicitation is L. C. Millhouse.
SOLICITATION NOTICE: THE COST FOR EACH SET OF PLANS AND SPECIFICATIONS
IS $80.00. THE POINT OF CONTACT IS RONNIE MITCHUM AT 803/743-4040.
THIS CHARGE IS NON-REFUNDABLE. To obtain plans and specifications make
company check payable to US Treasuryand send to the DEFENSE PRINTING
SERVICE DETACHMENT OFFICE, ATTN: RONNIE MITCHUM, P O BOX 71359,
CHARLESTON, SC 29415 OR FOR DIRECT OR EXPRESS MAIL DELIVERY, ADDRESS
YOUR REQUEST TO SUITE B 2825 AVENUE D. NORTH CHARLESTON, SC 29408-1802.
No telephoneorders can be accepted, however, if problems arise
concerning your request, call RONNIE MITCHUM at 803/743-4040. To obtain
a plan holders list FAX your request to 803/743-3027. For inquiries
about BID OPENING DATE, NUMBER OF AMENDMENTS ISSUED, CONTACTSUSAN CLARK
at (803) 820-5775. To obtain bid results, call (803) 820-5922 after
10:00 AM for a pre-recorded message that will be available the day
after scheduled bid opening. The demolition work includes removal of
existing portland cement concreteand asphaltic concrete pavements;
removal of existing fuel system including existing pumphouse with
associated pumps, pump control room, valves, vents, piping, underground
storage tanks and fire alarm system. New work includes new portland
cement andasphaltic concrete pavement; pavement markings; storm water
and subsurface drainage systems, new Type III Pressurized Hydrant Fuel
System, pumphouse, piping with continuous leak detection, and fire
protection; replacement of existing abovegroundairfield lights and new
electrical and lighting duct systems. There will be 180 days 5 bid
options. Bid Option 1, Demolition of pumpstation #2. Bid Option 2,
Demolition of pumpstation #3. Bid Option 3, Construction of all new
fire hydrants,associated valves and lateral lines and other
miscellaneous waterline work at existing water supply main. Bid Option
4, Construction of new water main and associated fire hydrants,
valves, lateral lines and other miscellaneous related work. Bid
Option5, Construction of new 120' mast lighting. Except when it is
determined in accordance with FAR 17.206(b) not to be in the
Governments best interests, the Government will evaluate offers for
award purposes by adding the total price for all options tothe total
price for the basic requirement. Estimated cost is OVER 10 MILLION.
Estimated duration of the contract is 360 calendar days for
completion.(0247) Loren Data Corp. http://www.ld.com (SYN# 0108 19960904\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|