COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 23,1996 PSA#1685Commanding Officer, Naval Facilities Engineering Command, P. O. Box
190010, North Charleston, SC 29419-9010 Y -- SQUADRON OPS/AMU FACILITY, CHARLESTON AFB, SC SOL
N62467-94-B-1124 POC Technical inquiries prior to bid opening MUST be
submitted in writing to the address listed above, or faxed to (803)
820-5853, Attention: Deborah Taylor Code 0212DT. The Contracting
Officer for this solicitation is L. C. Millhouse. PRESOLICITATION
NOTICE: THE COST FOR EACH SET OF PLANS AND SPECIFICATIONS IS $140.00.
THE POINT OF CONTACT IS RONNIE MITCHUM AT 803/743-4040. THIS CHARGE IS
NON-REFUNDABLE. To obtain plans and specifications make company check
payable to USTreasury and send to the DEFENSE PRINTING SERVICE
DETACHMENT OFFICE, ATTN: RONNIE MITCHUM, P O BOX 71359, CHARLESTON, SC
29415 OR FOR DIRECT OR EXPRESS MAIL DELIVERY, ADDRESS YOUR REQUEST TO
SUITE B 2825 AVENUE D. NORTH CHARLESTON, SC 29408-1802. Notelephone
orders can be accepted, however, if problems arise concerning your
request, call RONNIE MITCHUM at 803/743-4040. To obtain a plan holders
list FAX your request to 803/743-3027. For inquiries about BID OPENING
DATE, NUMBER OF AMENDMENTSISSUED, CONTACT SUSAN CLARK at (803)
820-5775. To obtain bid results, call (803) 820-5922 after 10:00 AM for
a pre-recorded message that will be available the day after scheduled
bid opening. The work includes demolition of buildings of
concreteblock, modular metal and wood frame construction along with
demolition of pavements and various utilities. New construction
consists of a 33,670 square foot, 2-story brick and structural steel
office building with standing seam roof and associated
siteimprovements, new pavement, landscaping and irrigation, area
lighting, drainage improvements, utilities and incidental related work.
The Govenment has 180 calendar days to exercise the Options. This
solicitation has 5 bid options. Option 001, thatportion of parking
immediately south of the new Squad Operations Bldg. as outlined on
sheet C-6 including landscaping and irrigation as outlined on sheet L-1
and area lighting as outlined on sheet E-5. Option 002, that portion of
roadways and parkingimmediatley west of the new Squad Operations Bldg.
including Bldg. 58 as outlined on sheet C-7 and including landscaping
and irrigation as outlined on sheet L-2 and area lighting as outlined
on sheet E-5 and continuing on sheet E-6. Option 003, thatportion of
roadways and parking immediately west of Option 002 as outlined on
sheet C-7 and continuing on sheet C-9 including landscaping and
irrigation as outlined on sheet L-2 and continuing on sheet L-4 and
area lighting as outlined on sheetE-6. Option 004, that potion of
roadways and parking immediately south of Bldg. 58 and north of Bldg.
51 as outlined on Sheet C-8 including landscaping and irrigation as
outlined on sheet L-3 and area lighting as outlined on sheet E-5 and
continuing onsheet E-6. Option 005, Activation of systems furniture
(systems furniture is delivered and installed by separate contract) as
shown on sheets A-42 and A-43 including hardwiring of power and data
in accordance with electrical drawings andspecifications. Except when
it is determined in accordance with FAR 17.206(b) not to be in the
Governments best interests, the Government will evaluate offers for
award purposes by adding the total price for all options to the total
price for the basicrequirement. Estimated cost is 5 - 10 MILLION.
Estimated duration of the contract is 360 calendar days for
completion.(0263) Loren Data Corp. http://www.ld.com (SYN# 0066 19960920\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|