COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 25,1996 PSA#1687Commanding Officer, Naval Facilities Engineering Command, P. O. Box
190010, North Charleston, SC 29419-9010 Y -- SQUADRON OPS/AMU FACILITY, CHARLESTON AFB, SC SOL
N62467-94-B-1124 DUE 111496 POC Technical inquiries prior to bid
opening MUST be submitted in writing to the address listed above, or
faxed to (803) 820-5853, Attention: Deborah Taylor Code 0212DT. The
Contracting Officer for this solicitation is L. C. Millhouse.
SOLICITATION NOTICE: THE COST FOR EACH SET OF PLANS AND SPECIFICATIONS
IS $140.00. THE POINT OF CONTACT IS RONNIE MITCHUM AT 803/743-4040.
THIS CHARGE IS NON-REFUNDABLE. To obtain plans and specifications make
company check payable to US Treasuryand send to the DEFENSE PRINTING
SERVICE DETACHMENT OFFICE, ATTN: RONNIE MITCHUM, P O BOX 71359,
CHARLESTON, SC 29415 OR FOR DIRECT OR EXPRESS MAIL DELIVERY, ADDRESS
YOUR REQUEST TO SUITE B 2825 AVENUE D. NORTH CHARLESTON, SC 29408-1802.
No telephoneorders can be accepted, however, if problems arise
concerning your request, call RONNIE MITCHUM at 803/743-4040. To obtain
a plan holders list FAX your request to 803/743-3027. For inquiries
about BID OPENING DATE, NUMBER OF AMENDMENTS ISSUED, CONTACTSUSAN CLARK
at (803) 820-5775. To obtain bid results, call (803) 820-5922 after
10:00 AM for a pre-recorded message that will be available the day
after scheduled bid opening. The work includes demolition of buildings
of concrete block, modular metaland wood frame construction along with
demolition of pavements and various utilities. New construction
consists of a 33,670 square foot, 2-story brick and structural steel
office building with standing seam roof and associated site
improvements, newpavement, landscaping and irrigation, area lighting,
drainage improvements, utilities and incidental related work. The
Govenment has 180 calendar days to exercise the Options. This
solicitation has 5 bid options. Option 001, that portion of
parkingimmediately south of the new Squad Operations Bldg. as outlined
on sheet C-6 including landscaping and irrigation as outlined on sheet
L-1 and area lighting as outlined on sheet E-5. Option 002, that
portion of roadways and parking immediatley west ofthe new Squad
Operations Bldg. including Bldg. 58 as outlined on sheet C-7 and
including landscaping and irrigation as outlined on sheet L-2 and area
lighting as outlined on sheet E-5 and continuing on sheet E-6. Option
003, that portion of roadwaysand parking immediately west of Option
002 as outlined on sheet C-7 and continuing on sheet C-9 including
landscaping and irrigation as outlined on sheet L-2 and continuing on
sheet L-4 and area lighting as outlined on sheetE-6. Option 004, that
potion of roadways and parking immediately south of Bldg. 58 and north
of Bldg. 51 as outlined on Sheet C-8 including landscaping and
irrigation as outlined on sheet L-3 and area lighting as outlined on
sheet E-5 and continuing onsheet E-6. Option 005, Activation of systems
furniture (systems furniture is delivered and installed by separate
contract) as shown on sheets A-42 and A-43 including hardwiring of
power and data in accordance with electrical drawings
andspecifications. Except when it is determined in accordance with FAR
17.206(b) not to be in the Governments best interests, the Government
will evaluate offers for award purposes by adding the total price for
all options to the total price for the basicrequirement. Estimated
cost is 5 - 10 MILLION. Estimated duration of the contract is 360
calendar days for completion.(0267) Loren Data Corp. http://www.ld.com (SYN# 0113 19960924\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|