|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 10,1996 PSA#1698SOUTHWESTNAVFACENGCOM (Code 0211), 1220 Pacific Highway, San Diego, CA
92132-5187 C -- ARCHITECTURAL ENGINEERING SERVICES AND PLANS AND SPECIFICATIONS
FOR FY98 MILCON P-202, ORDNANCE FACILITY, NAVAL AIR FACILITY, EL
CENTRO, CALIFORNIA SOL N68711-96-C-2130 DUE 111396 POC Samantha
Darella/Contract Specialist, (619) 532-3839, Nancy Trent/Contracting
Officer, (619) 532-2853. Firm Fixed Price. Architect-Engineer services
are required for Design, and preparation of plans, specifications and
cost estimates for the purpose of bidding and construction of an
Ordnance Facility at NAF El Centro to include, high explosive
magazines, small arms/pyrotechnics magazine, inert storage facilities,
truck holding areas, bomb and rocket assembly facilities, combat
aircraft loading pads, site improvements, lighting protection, road
pavement, utilities and demolition.The estimated start date is January
1997. The estimated completion date is Sept 1997. The contract will be
negotiated on the basis of final design services. Only authority for
synopsis, slate and selection is available at this time for the project
engineering phase. The estimated construction cost is over $10,000,000.
A/E Selection criteria will include (in order of importance): (1) The
most recent specialized experience of the firm (including
consultants)in the design of explosive magazines, weapons assembly
facilities, combat aircraft loading pads, inert storage facilities,
truck holding areas, lightning protection, roadways, utilities, support
facilities and demolition. Do not list more than a total of 10 projects
in block 8. Include point of contact, name and telephone number, in
block 8C. Indicate which consultants from the proposed team, if any,
participated in the design of each project. (2) Professional
qualifications of the staff to be assigned to this project with
experience in the design of explosive magazines, weapons assembly
facilities, combat aircraft loading pads, inert storage facilities,
truck holding areas, lightning protection, roadways, utilities, support
facilities and demolition. Do not list more than a total of 10 projects
in block 8. Include point of contact, name and telephone number, in
block 8C. This work may require the ability to coordinate various
engineering disciplines and the various aspects of phased construction.
List only the team members who will perform major tasks under this
project. Qualification should reflect the individual's potential
contributions to this project. (3) Past performance on contracts with
government agencies and private industry in terms of cost control,
quality of work and compliance with performance schedules. Indicate by
briefly describing internal quality assurance and cost control
procedures and indicate team members who are responsible for monitoring
these processes. List recent awards, commendations and other
performance evaluations (do not submit copies). (4) Location in the
general geographic area of the project and knowledge of the locality of
the project, provided that the application of this criterion leaves an
appropriate number of firms given the nature and size of this project.
(5) Capacity to accomplish the work in the required time. Indicate the
firms present workload and the availability of the project team
(including consultants) for the specified contract performance period
and indicate specialized equipment available and prior security
clearances. (6) List the small or disadvantaged or woman-owned business
firms used as primary consultants or as subconsultants. If a large
business concern is selected for this contract, they will be required
to submit a subcontracting plan that should reflect a minimum 5% Small
Disadvantaged Business of the amount to be subcontracted out. (7)
Demonstrated success in prescribing the use of recovered materials and
achieving waste reduction and energy efficiency in facility design.
Those firms which meet the requirements described in this announcement
and wish to be considered, must submit one copy each of a SF 254 and
a SF 255 for the firm and a SF 254 for each consultant listed in block
6 of the firms SF 255. One copy of the submittal package is to be
received in this office no later than 3:00 P.M. Pacific Time on the due
date indicated above. Should the due date fall on a weekend or holiday,
the submittal package will be due the first workday there after.
Submittals received after this date and time will not be considered.
Additional information requested of applying firms: indicate
solicitation number in block 2b, CEC (Contractor Establishment Code)
and/or Duns number (for the address listed in block 3) and TIN number
in block 3, telefax number (if any) in block 3a and discuss why the
firm is especially qualified based on the selection criteria in block
10 of the SF 255. For firms applying with multiple offices, indicate
the office which completed each of the projects listed in block 8 and
list which office is under contract for any contracts listed in block
9. Use block 10 of the SF 255 to provide any additional information
desired. Personal interviews may not be scheduled prior to selection of
the most highly qualified firm. SF 255's shall not exceed 30 printed
pages (double sided is two pages/organizational charts and photographs
excluded, exception: photographs with text will be considered as a
page). All information must be included on the SF 255 (cover letter,
other attachments and pages in excess of the 30 page limit will not be
included in the evaluation process). Firms not providing the requested
information in the format (i.e. listing more than a total of 10
projects in block 8, not providing a brief description of the quality
control plan, not listing which office of multiple office firms
completed projects listed in block 8, etc.) directed by this synopsis
may be negatively evaluated under selection criteria (3). Firms, their
subsidiaries or affiliates, which design or prepare specifications for
a construction contract or procurement of supplies cannot provide the
construction or supplies. This limitation also applies to subsidiaries
and affiliates of the firm. This is not a request for proposal.
Telegraphic and facsimile SF 255's will not be accepted. Site visits
will not be arranged during the submittal period. See Numbered Note(s):
24. (0282) Loren Data Corp. http://www.ld.com (SYN# 0015 19961009\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|