|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 21,1996 PSA#1704Department of Veterans Affairs Medical Center, 50 Irving Street, N.W.,
Washington, DC 20422 J -- PREVENTIVE MAINTENANCE - VARIAN LINEAR ACCELERATOR SOL IFB
688-24-97 DUE 110696 POC Tyrone Lassiter, Contracting Officer, (202)
745-8467 Invitation for Bids No. 688-24-97 is a combined
synopsis/solicitation for commercial items for the Veterans Affairs
Medical Center (VAMC) in Washington, DC, prepared in accordance with
the format in FAR Subpart 12.6, as supplemented with additional
information in this notice (SIC 7699). This announcement constitutes
the only solicitation; bids are being requested and a written
solicitation will NOT be issued. Contractor shall furnish all labor,
equipment, tools, parts and materials (excluding glassware -
radiographic emission/image intensifier tubes) required for inspection,
on-call repair service, and Preventive Maintenance (PM) of equipment
listed located at the VAMC, 50 Irving Street, NW, Washington, DC. The
contract period will be from the date of award through September 30,
1997, subject to the availability of funds. Contract may be amended for
two (2) one year options in accordance with the clause at 52.217-9,
Option to Extend the Term of the Contract. Schedule of Equipment
located in Room GC116-1, Varian Linear Accelerator Model:18, S/N:096,
Bar Code:50, to include all systems subsystems, components, and
existing backup boards and modules. Bidders shall submit a price for a
Base Year of (12 mos.), Option Year I (12 mos.) & Option Year II (12
mos.). Normal hours of coverage for this contract are Monday through
Friday 8:00 a.m. to 4:30 p.m., excluding federal holidays. All
service/repairs shall be performed during normal hours of coverage with
prior approval of the COTR. At the request of the Contractor's Field
Service Engineer (FSE), the COTR may approve service outside normal
hours of coverage at no extra cost to VA. The FSE shall perform PMs in
accordance with manufacturer specifications. PMs include but shall not
be limited to cleaning equipment; reviewing operating system software
diagnostics to ensure that the system is operating in accordance with
manufacturer's specifications; calibrating and lubricating the
equipment; performing remedial maintenance/repairs of non-emergent
nature; testing and replacing faulty and worn parts and/or parts likely
to become faulty, fail, or become worn (does not include glassware);
inspecting all high voltage cables and bushings, replacement of
dielectric; measuring and adjusting and calibrating as necessary for
optimal image quality, inspecting and replacing, when necessary,
electrical wiring and cables for wear and fraying; all mechanical
components including but not limited to: X-ray tube mounting hardware,
electron tubes and cathode ray tubes, patient restraints and support
devices, cables and mounting hardware, chains, belts, bearings and
tracks, interlocks, clutches, motors, keyboards, and patient couches
for mechanical integrity, safety, and performance; measuring,
adjusting, and calibrating for optimal image quality (applicable for
imaging equipment); providing documentation of services performed,
including photographs, radiation dosage measurements, and all
applicable x-ray film exposures, of all measurements and calibration to
ensure that the system is performing in accordance with the CDRH
regulations, Title 21, Chapter I, Subchapter J, Radiological Health,
Part 1020, Performance Standards for Ionizing Radiation Emitting
Products, Sections 30 & 33 as applicable, based upon the date of system
manufacture or remanufacture (as applicable); and inspecting and
calibrating the hard copy image device (as applicable). Preventive
maintenance shall be performed annually in the month of November. The
day of the PM service must be scheduled by the FSE and the COTR at
least a week in advance. All exceptions to the preventive maintenance
schedule shall be arranged and approved in advance with the COTR. The
Contractor shall provide unscheduled maintenance and repair services as
necessary to ensure the equipment remains in good operating condition.
Repair service shall be achieved by returning failed components of a
system to full operational capacity. These repair services may consist
of calibrating, cleaning, oiling, adjusting, replacing parts broken or
worn beyond useful life (excluding glassware), and maintaining the
equipment, including all intervening calls necessary between regular
services and calibrations. Repair shall be carried out with the
objective of minimizing downtime. Service calls to the Contractor are
only authorized when they are received from the Contracting Officer,
COTR or authorized designee. Contractor's FSE must respond with a phone
call to the COTR within (1) hour after receipt of telephoned
notification. If the problem can not be corrected by phone, the FSE
shall commence work (on-site physical response) within (4) hours after
receipt of notification and shall proceed progressively to completion
without undue delay. For example, if hours of coverage are 8:00 a.m.
to 4:30 p.m., M-F, a (2) hour response means, if a call is placed at
4:15 p.m., Monday, May 10th, the FSE must start on-site service before
9:45 a.m., Tuesday, May 11th, except when service outside hours of
coverage is authorized by the COTR. All equipment listed in the
schedule of equipment shall be operable and available for use 95% of
the normal hours of coverage. Downtime shall be computed based on hours
of coverage, beginning when the request for service is initiated and
ending when the equipment is returned to full operational condition and
accepted by the using service. Scheduled service shall be excluded from
downtime. Downtime shall be computed monthly. Penalties shall be
assessed by deducting monies for failure to maintain the guaranteed
uptime at 95%. Penalties will be computed quarterly based upon meeting
the uptime percentage. The Contractor shall furnish and replace all
equipment replacement parts (excluding glassware). These parts are
included in the price of this contract. The Contractor shall have ready
access new standard parts (manufactured by the maker of the equipment
or equal thereto) including unique and high morality replacement parts.
Rebuilt parts, used parts, or those removed from the same model of
equipment shall not be installed. All parts supplied by the Contractor
shall be of current manufacture and have complete versatility with the
presently installed equipment. All modifications, upgrades, updates, or
enhancements, must be scheduled in advance with the COTR. The COTR must
receive notice at least 1 week in advance before any equipment updates,
upgrades or enhancements are begun along with justification (if
Vendor-suggested modification), estimated costs (if applicable),
probable effect on equipment operation, and needs for new or additional
in service training. Approval of the COTR and a VAMC equipment pass
must be obtained before removing equipment, with no additional costs to
the government. The Contractor will be responsible for loss or damage
of equipment. The VAMC shall not provide service manuals or service
diagnostic software to the Contractor. Within 30 days after award, the
Contractor shall provide the COTR with a copy of the preventive
maintenance procedures to be used, provide a copy of the current
calibration/certification of all test equipment to be used by the
Contractor on the equipment, and shall inspect/ reject any equipment
deemed to be in poor operating condition. Failure to reject such
equipment shall constitute acceptance. Upon rejection, the CO shall be
notified in writing as to the specific item(s) of equipment deemed to
be in poor operating condition. Test equipment calibration shall be
traceable to a national standard and shall be periodically checked for
compliance. MANDATORY CHECK-IN PROCEDURES The Contractor's FSE shall
be required to report to the COTR in Room GC105-1 at the VAMC, were a
contractor's ID badge shall be issued and worn at all times while on VA
property (and surrendered upon completion of the job), the FSE shall
log in (name, name of Contractor, current date, time in, location of
service/equipment, and time out. The FSE shall document services
rendered on a properly completed Service Report/Ticket (SR). The FSE
shall be required to log out with Biomedical Engineering and submit the
SR to the COTR. All SRs shall be submitted to the equipment user for an
''acceptance signature'' and to the COTR for an ''authorization
signature''. If the COTR is unavailable, a signed, authorized copy of
the SR will be sent to the Contractor after the work is reviewed. When
the job cannot be completed by 4:30 p.m. during normal working hours,
a status of progress, in the form of an SR and verbal description,
must be provided to the COTR before 4:00 p.m. There shall be no
additional charge for time spent at the site awaiting the arrival of
additional FSE and/or delivery of parts. Outside normal working hours
when the COTR is unavailable, FSEs shall be required to log in and out
with VA Police Service in the lobby or room 1A114 and receive proper
ID badges. SR's for these services, both completed or in progress, will
need an ''acceptance signature,'' and should be dropped off at a point
agreed upon with the COTR. SR's shall include detailed descriptions of
scheduled maintenance and emergency repairs, including replaced parts
and prices required to maintain the equipment; shall consist of a
separate report containing equipment manufacturer's name/model/serial#,
name of Contractor; name of FSE who performed services; contractor
service SR number; date, time (start/end), equipment downtime and hours
on-site for service call; VA purchase order number covering the call;
description of problem reported by COTR/user (if applicable); results
of calibration and/or performance testing; total cost to be billed if
part(s) are not covered or service rendered after normal hours of
coverage; authorization signatures; FSE performing services described;
authorization signature by COTR if available. Any additional charges
claimed by the FSE/Contractor must be approved by the COTR before the
service is completed. The Contractor shall immediately, but not later
than twenty-four (24) hours after discovery, notify the CO and the
COTR, IN WRITING of the existence or the development of any defects in,
or repairs required to the schedule of equipment which the Contractor
considers not to be responsible for under the terms of the contract.
The Contractor shall furnish the CO and COTR with a written estimate of
the cost to make necessary repairs. Invoices will be paid in arrears on
a quarterly basis. The Contractor shall mail the invoices to the
attention of Fiscal Service. Invoices, MUST INCLUDE, at a minimum, the
following information: Contractor name, purchase order number, period
of service the billing covers, list of equipment items and their
serial numbers covered during the stated period of service. Each
invoice must be accompanied by legible copies of all SRs in order to
expedite verification for payment. The Contractor shall provide written
assurance of the competency of their personnel and a list of
credentials of approved FSEs . The CO may authenticate the training,
request training certificates or credentials from the Contractor at any
time for any personnel servicing VAMC equipment. The CO and COTR
specifically reserves the right to reject any uncredentialed or
incompetent FSE. If subcontractor(s) are used, they must be approved by
the CO; the Contractor shall submit any proposed change in
subcontractor(s) to the CO for approval or disapproval. The Contractor
agrees to comply with the following incorporated provisions and
clauses in effect through FAC 90-42 and which are applicable to this
acquisition: 52.212-1, Instructions to Offerors --Commercial Items;
52.212-5 Contract Terms and Conditions Required to Implement Statutes
or Executive Orders--Commercial Items: 52.222-3, Convict Labor (E.O.
11755) and 52.233-3, Protest After Award; 52.203-6, Restrictions on
Subcontractor Sales to the Government, with Alternate I; 52.203-10,
Price or Fee Adjustment for Illegal or Improper Activity; 52.216-18,
Ordering, 52.216-19, Delivery-Order Limitations, 52.216-21,
Requirements, 52.217-5 Evaluation of Options; 52.219-8, Utilization of
Small Business Concerns and Small Disadvantaged Business Concerns;
52.219-9, Small, Small Disadvantaged and Women-Owned Small Business
Subcontracting Plan; 52.219-14, Limitation on Subcontracting;
52.222-26, Equal Opportunity; 52.222-35, Affirmative Action for Special
Disabled and Vietnam Era Veterans; 52.222-36, Affirmative Action for
Handicapped Workers. All bid prices for this procurement must be
received on company letterhead, in a SEALED ENVELOPE, no later than
4:00 p.m. EST, November 6, 1996, and shall be addressed to Tyrone
Lassiter, Contracting Officer (90C), Room 1B112, VA Medical Center, 50
Irving Street, NW, Washington, DC 20422. FAXED requests will not be
accepted. (0291) Loren Data Corp. http://www.ld.com (SYN# 0032 19961018\J-0003.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|