Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 31,1996 PSA#1712

Ecology and Environment, Inc., 33 North Dearborn Street, Chicago, IL 60602

Y -- DECONTAMINATE ABOVE/UNDERGROUND TANKS/EQUIPMENT VAULTS, DEMOLISH ABOVEGROUND TANKS; INSTALL GROUNDWATER/NAPL EXTRACTION SYSTEM; CONSTRUCT GROUNDWATER TREATMENT SYSTEM AND BUILDING SOL ZK7041. POC Project Manager, Benjamin L. Horenziak, P.E., 312/578-9243. This project was the subject of a previous solicitation notice on March 10, 1995, which was canceled and is being reissued as a new procurement with a revised scope and schedule. Funding for this project by the United States Environmental Protection Agency is in place. Proposals are due by 4:30 PM, December 2, 1996. Solicitations are requested for services for remediation of a US EPA Superfund project involving hazardous wastes associated with a former creosote and pentachlorophenol wood treating facility in New Brighton, Minnesota. The project implements an Interim Remedial Action at the MacGillis & Gibbs/ Bell Lumber and Pole Superfund Site. This action requires the removal of liquids and sludges from 9 aboveground storage tanks (ASTs), 8 underground storage tanks (USTs), 3 underground equipment vaults (vaults), the decontamination of ASTs, USTs, and vaults, the demolition of the ASTs, one extraction well, one piezometer, a pump test, a groundwater extraction system, a non-aqueous phase liquid extraction system, waste disposal, biological groundwater treatment system, a groundwater treatment building, and discharge pressure main. The contract is anticipated to be awarded by January 15, 1997. Construction is anticipated to begin April 1, 1997 with substantial completion by October 31, 1997. Included in the construction period is three months of shakedown operation to prove-out the specified operational efficiencies after substantial completion. This description of work to be performed is not intended to be all encompassing for the total project. A full description of the work to be completed is included in the detailed plans and specifications (design sets) available from the above stated address. Interested parties may obtain copies of the design sets upon payment of $100 in check or money order, payable in US funds to Ecology and Environment, Inc., drawn upon a US financial institution, for each complete set. Cash will not be accepted. Requests for design sets should be sent to the project manager and must include the name of the person to receive the design set, the physical address of that person and the phone number. Design sets will be sent by express courier. A pre-bid meeting is tentatively scheduled for November 12, 1996, at a location near to the site. The exact time and location will be included in the cover letter accompanying the design sets. Prospective bidders are advised of the following condition: 1) Site access is restricted. 2) Personnel entering or performing work on the site will require medical monitoring and safety training in compliance with 29 CFR 1910.120. 3) Statements of safety training and medical fitness in compliance with 29 CFR 1910.120 are required from all parties prior to entering upon the site, including the pre-bid site inspection. 4) The format for these statements is included in the design set. 5) All requests for information must be in writing. 6) Responses to inquiries received regarding the previous solicitation will be sent to parties receiving design sets. (303)

Loren Data Corp. http://www.ld.com (SYN# 0099 19961030\Y-0010.SOL)


Y - Construction of Structures and Facilities Index Page