COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 1,1996 PSA#1713DIRECTORATE OF CONTRACTING, BLDG 681 USMA, WEST POINT NY 10996-1594 45 -- SEWAGE PLANT CLARIFIER SOL 107&&&-9610-0001 POC Annemarie
Kopko,Contracting Officer 914-938-8176,FAX 914-938-8183 (Site Code
DAAG60) Sources sought to remove existing clarifier and replace entire
clarifier at Camp Buckner Sewage Plant, Bldg. 1601 to include
replacement or retrofit the bridge, drive, motor and gears, scraper
arms, skimmer blade, full trough and adjustable weirs. The existing
clarifier tank will not be replaced. Repairs to tank or modifications
may be required. Plant is in an enclosed building which has access
through overhead door opening measuring (9) nine feet in height and (7)
seven feet wide. The existing sewer tank is steel side walls, concrete
floor, the tank is approximately 22 feet in diameter, approx. 16 feet
deep, the bottom well is approx. (3) three feet in diameter. The
electrical service is 460 volts, 3 phase. The sewer plant is rated at
.25 million gallons per day. Interested sources submit descriptive
literature to Annemarie Kopko, FAX 914-938-8183 no later than(0304) Loren Data Corp. http://www.ld.com (SYN# 0223 19961031\45-0002.SOL)