COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 13,1996 PSA#1720Washington Metropolitan Area Transit Authority, Department of
Procurement, 600 Fifth St., N. W., Washington, DC 20001 Y -- CONSTRUCTION SOL IFB C-1001/Contract 1Z7043 DUE 011597 POC
Shehzad K. Rajpal, (202) 962-2490 Sealed bids are invited for
IFB-C-1001, Contract 1Z7043, for the installation of traction power
equipment for two traction power substation and two tie-breaker station
facilities located along the Mid City E-Route (between Fort Totten and
Cardozo Metro Stations). It also includes the procurement and
installation of twelve stainless steel roll down doors (Tunnel
Ventilation Barriers). Estimated cost is $1,000,000 to $5,,000,000;
work is to be completed by November 1998; DBE goal is 21%; Bids open on
or around 01/15/97. Set of Contract Spefifications cost $20; Full size
drawings cost $40/each set; Set of Half size drawings $30 and the
Insurance Specs. or the Safety manual $5/each. To purchase Specs. and
plans, call 202-269- 4575; Fax. (202)-635-6431; or write to WMATA Plans
Room, 900 Franklin Street, N.E., Washington D.C. 20017. For technical
questions, call Chris Beres at 202-962-1510 and for other questions,
call Shehzad Rajpal at 202-962-2490. SKR. (0313) Loren Data Corp. http://www.ld.com (SYN# 0085 19961112\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|