Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 15,1996 PSA#1722

SOUTHWESTNAVFACENGCOM (Code 551) 1220 Pacific Highway, San Diego, CA 92132-5187

C -- A-E SERV.FOR VARIOUS PROJ.FOR MECH.,ELECT.,& FIRE PROTEC. ENG. FOR RENOV.& REPAIR AT VARIOUS FAC.IN AZ/NM/CLARK COUNTY/NEVADA/ IMPERIAL/MONO/RIVERSIDE/SAN BERNARDINO COUNTIES/CAMP PENDLETON/CA. SOL N68711-95-D-8503 DUE 121896 POC Samantha Darella/Contract Specialist, (619) 532-3839, Alice Barker/Contracting Officer, (619)532-2853. 17. Firm Fixed Price. Architect-Engineer services are required for Design, and for the preparation of Drawings and Specifications, for the purpose of bidding and construction of the Renovation and Repair of facilities located at various Naval/Marine Corps activities within the areas of Arizona and New Mexico, in Clark County, Nevada, in Imperial, Mono, Riverside and San Bernardino Counties, California, and at Camp Pendleton, California. The term of the contract will be 365 calendar days from the date of the contract award, or until the $1,000,000 limit is reached. The Government has the option to extend this contract for an additional 365 calendar days, or until an additional $1,000,000 is reached. The A-E fee for any single delivery order shall not exceed $200,000. Projects to be incorporated by delivery order into this contract shall be for the preparation of Designs, Drawings and Specifications for repairs and minor construction of various projects. The lead discipline shall be an Engineer supported by all required supporting Architectural and Engineering disciplines. The estimated start date is January, 1997. The estimated completion date is January, 1998. If the Government exercises the option to extend the contract, the total amount of the contract shall not exceed $2,000,000. A-E section criteria will include (in order of importance): (1) Recent Specialized Experience of the firm (including consultants) in the preparation of Designs, Drawings and Specifications for repairs and minor construction for various facilities at several locations. This work will include design and preparation of contract documents for interior/exterior renovations/alterations, repair and minor construction projects, including site surveys, M2 or R2 Special Project Documentation, preparation of DD Form 1391, site surveys, site investigations, interior design, cost estimating and economic analyses required to develop and define actual costs of construction projects, including special costs for fire protection and life safety systems, utilities, seismic reinforcement, and geotechnical engineering requirements. This work will require the ability to coordinate various architectural and engineering disciplines and the various aspects of phasing construction to accommodate occupied/unoccupied facilities. Projects may also require the identification and removal of asbestos and lead-based paint. Do not list more than a total of ten (10) projects in Block 8. Indicate which consultants from the proposed team, if any, participated in the preparation of designs, drawings and specifications for each of the projects listed.(2) Professional Qualifications of the staff and consultants to be involved in the preparation of Designs, Drawings and Specifications for repairs and minor construction for various facilities at several locations. Including design and preparation of contract documents for interior/exterior renovations/alterations, repair and minor construction projects, including site surveys, M2 or R2 Special Project Documentation, preparation of DD Form 1391, site surveys, site investigations, interior design, cost estimating and economic analyses required to develop and define actual costs of construction projects, including special costs for fire protection and life safety systems, utilities, seismic reinforcement, and geotechnical engineering requirements. Also, include experience with the ability to coordinate various architectural and engineering disciplines and the various aspects of phasing construction to accommodate occupied/unoccupied facilities. Projects may also require the identification and removal of asbestos and lead-based paint. List only the team members who will actually perform major tasks under this contract. Qualifications should address each individuals specific contribution to the efforts contemplated by this contract. See Numbered Note(s): 24. (0318)

Loren Data Corp. http://www.ld.com (SYN# 0015 19961114\C-0001.SOL)


C - Architect and Engineering Services - Construction Index Page