COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 18,1996 PSA#172347 Contracting Squadron, 171 Alabama Ave, Laughlin AFB, TX 78843-5102 Z -- FLOORING SOL F4168597T0034 DUE 121796 POC Contact John Murray,
(210)298-4352/Contracting Officer, Jim Weed (210)298-5117 Flooring,
access- Furnish all labor, tools, materials, equip., and transportation
necessary to remove flooring acess panels & replace with new onesat
Bldg 241, Laughlin AFB TX. Laughlin is located on Hwy 90, 155 miles
west ofSan Antonio, near Del Rio TX. The existing access flooring shall
be removed and transferred to Bldg 2025. Panels shall be compatible
with existing under- structure(pedistals and stringers) manufactured by
GH International Inc (series 900), which shall not be removed. The
understructure is to be leveled to exist-ing panels height prior to
installation of new flooring. Floors shall be levelwithin 1/6''
measured with a 10 ft straighedge in all directions. Additional
supports to be provided at heavy equipment locations. Prior to
installation of new panels, the existing understructure shall be
grounded. Testing of electri- cal resistance in the completed
installation to be IAW NFPA 99 at an average of 5 or more lacations and
to be done in the presence of the contracting officer/ designee. The
new flooring panels are 24 in. squares, made of steel encapsualted
concrete core panels with hi-pressure laminated linoleum tile
covering,color to be ''gray matrix''. Perforated panels shall be
provided as required. The area to be covered is approx. 4140 Sq. Ft.
Also, as needed provide flooring grommets and ''l-Trim'' for the
protection of cables that penetrate this access flooring. Remove and
replace cove base at areas receiving the new flooring. Cove base to be
vinyl, 4'' high, at least 1/8'' thick. Color: light gray. Spare floor
panels, complete pedistal assemblies and spare stringers to be
furnished at rate of one spare for 100 existing assemblies or fraction
therof. Each in- dividual room (there are 5) to be provided with one
floor panel lifting device std. with the approved floor mfr'er. A site
visit is highly recommended. Access flooring panels to be installed by
a qualified contractor, authorized by the approved floor mfr'er and IAW
the mfr'ers recommended procedures. Com- pleted floor shall be rigid
and free of any loose or rocking panels, as warranted. Submittals: The
contractor is reqd to submit the following docu- ments to contracting
officer for approval prior to the start of work: A. Mfr'ers
descriptive data and installation instructions. Also, cleaning &
maintenance instructions. B. Mfr'ers color samples for floor finish and
one cut, size 6'' sq. of the floor panel to be applied. c. Certificate
of compli- ance attesting that the raised floor system meets specified
requirements. The submittals shall be done via AF Form 3000, which is
available from the contracting officer. (0319) Loren Data Corp. http://www.ld.com (SYN# 0135 19961115\Z-0004.SOL)