Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 2,1996 PSA#1732

U.S. Department of Labor, ETA, Division of Acquisition and Assistance, 200 Constitution Avenue, N.W., Room S-4203, Washington, D.C. 20210

Y -- PY'94/95/96 EMERGENCY GENERATOR AND WATER STORAGE TANKS AT THE RAMEY JOB CORPS CENTER IN RAMEY, PUERTO RICO SOL IFB-97-DAA-13-JC DUE 010997 POC Mr. Rafael G. Mendez (809) 712-3900 or Mr. Anthony Hill (202) 219- 8706.. The work to be performed under this project involves the installation of the three new emergency power generators including automatic transfer switches, emergency distribution panel and fuel tanks, and relocation of one existing emergency generator, automatic transfer switch and fuel tank. Installation of a concrete water tank located on the high elevation and a steel or fiberglass tank located on the roof including all underground piping revisions, pumps, valves, and regulators. Replacement of the existing main distribution panel and safety disconnect switches with new panel and feeders in the boiler room of building 759A. The estimated construction cost range is $250,000 to $500,000. The estimated completion time is 224 calender days. Plans and Specifications will be available on December 5, 1996, from the office of the Architect/Engineer, Mendez, Brunner, Badillo and Associates, 1018 Ashford Ave., Suite 3-B, San Juan, Puerto Rico, contact Rafael Mendez (809) 712-3900 for additional information regarding this project. Collect calls will not be accepted. It is emphasized that requests for plans and specifications shall be directed to the A/E firm listed above to ensure proper handling of requests. Requests will be answered on a first-come, first-serve basis until supplies are exhausted. For requests made after the supply is exhausted, the Contracting Officer may determine whether payment of a fee is warranted. The non-refundable fee shall not exceed the actual cost of duplication of the IFB documents, plus COD charges. Pre-bid walk-thru is scheduled December 19, 1996, at 10:00 a.m. local time. Bid-opening is January 9, 1997 at 2:00 p.m. local time. This is a 100% SMALL BUSINESS SET-ASIDE. The Standard Industrial Classification (SIC) is 1711. See numbered note(s): 1**** (0332)

Loren Data Corp. http://www.ld.com (SYN# 0116 19961129\Y-0004.SOL)


Y - Construction of Structures and Facilities Index Page