|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 3,1996 PSA#1733Arnold Engineering Development Center, ATTN: PKP, 100 Kindel Drive,
Suite A332, Arnold AFB TN 37389-1332 Z -- PAINT PWT BRIDGE CRANE, PHASE III SOL F40650-97-B-0007 DUE 012497
POC Tony Clayborne, Contracting Officer, (615) 454-7841 This
requirement if for providing all materials, labor, plant, and equipment
for surface preparation, coating systems, and application methods to
coat the Propulsion Wind Tunnel overhead bridge crane structure. This
requires the cleaning and applying of protective coating to previously
coated surfaces. The previous coating contains lead-based paint and
will require containment areas during the removal process. Special
handling of the lead waste stream is required. The contract performance
period will be 180 calendar days after issuance of notice to proceed.
The estimated magnitude is between $500,000 and $1,000,000. Any
responsible source may submit a bid which shall be considered. Firms
responding to this synopsis should do so in writing and indicate
whether or not they are a minority business concern. Foreign
participation is authorized. (0334) Loren Data Corp. http://www.ld.com (SYN# 0071 19961202\Z-0010.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|