Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 9,1996 PSA#1737

SOUTHWESTNAVFACENGCOM, South Bay Area Focus Team (Code 540), 2585 Callagan Highway, Naval Station, San Diego, CA 92136-5198

C -- INDEFINITE QUANTITY CONTRACT FOR A-E SERVICES FOR VARIOUS PROJECTS INVOLVING DESIGN FOR WATERFRONT CONSTRUCTION AND REPAIRS VARIOUS LOCATIONS IN SAN DIEGO, CALIFORNIA SOL N68711-97-D-8415 DUE 011397 POC Contract Specialist, Chuck Benson/Contracting Officer, Janet Buyson. Firm Fixed Price/Indefinite Quantity Contract for furnishing of Waterfront Engineering services including design, surveys, construction support, reports, cost estimates and related studies for projects involving waterfront construction and repairs, including reinforced concrete piers, fendering systems (i.e. foam filled fenders with prestressed concrete piles and timber fender piles with log camels), recycled plastic piles, and dredging at various locations in the San Diego area. The total amount of the proposed contract shall not exceed $2,000,000. No single delivery order may exceed $500,000. The Government has the option to extend this contract for one additional year, or $2,000,000, whichever comes first. The total amount of the contract shall not exceed $4,000,000. The minimum contract amount will be $25,000. A-E selection criteria will include (in order of importance): (1) Recent (1991 to present) specialized experience and technical competence of the firm in design for construction and repair ofreinforced concrete piers, fendering systems (i.e. foam filled fenders with prestressed concrete piles and timber fender piles with log camels), recycled plastic piles, and dredging (if the firm has more than one office, indicate the office to perform the work and the experience of that office in the type of work required). DO NOT list more than a total of 10 projects in Block 8. Include point of contact and telephone number in block 8c for each project listed. Indicate which consultants from the proposed team, if any, participated in the design of each project listed. (2) Professional qualifications and recent specialized experience of the staff in design for construction and repair of reinforced concrete piers, fendering systems (i.e. foam filled fenders with prestressed concrete piles and timber fender piles with log camels), recycled plastic piles, and dredging. Provide qualifications and experience for each member of the team who would perform design on projects under this contract. (3) Past performanceon contracts with government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. Indicate by briefly describing internal quality assurance and construction cost control procedures and indicate team members who are responsible for monitoring these processes. List recent awards, commendations and other performance evaluations (do not submit copies). (4) Location in the general geographic area of the projects and knowledge of the locality of the projects, provided that the application of this criterion leaves an appropriate number of firms given the nature and size of the contract. (5) Capacity to accomplish the work in the required time. Indicate the firm's present workload and the availability of the project team (including consultants) for the specified contract performance period and indicate specialized equipment available and prior security clearances. (6) Demonstrated success in prescribing the use of recovered materials and achieving waste reduction and energy efficiency in facility design. (7) List the small or small disadvantaged or woman-owned business firms used as primary consultants or as subconsultants. If a large business concern is selected for this contract, they will be required to submit a subcontracting plan that should reflect a minimum of 5% Small Disadvantaged Business of the amount to be subcontracted out. The Standard Industrial Code is 8711 and the annual size standard is $2.5 million. Those firms which meet the requirements described in this announcement and wish to be considered, must submit one copy each of a SF 254 and a SF 255 for the firm and a SF 254 for each consultant listed in Block 6 of the firm's SF 255. One copy of the submittal package is to be received in this office (South Bay Area Focus Team, Code 540, 2585 Callagan Highway, Naval Station, San Diego, CA 92136-5198) no later than 3:00 P.M. Pacific Time on the due date indicated above. Should the due date fall on a weekend or holiday, the submittal package will be due the first workday thereafter. Submittals received after this date and time will not be considered. Additional information requested of applying firms: indicate solicitation number in Block 2b, CEC (Contractor Establishment Code) and/or DUNs number (for the address listed in Block 3) and TIN number in Block 3, telefax number (if any) in Block 3a, and discuss why the firm is especially qualified based on the selection criteria in Block 10 of the SF 255. For firms applying with multiple offices, indicate the office which completed each of the projects listed in Block 8 and list which office is under contract for any contract listed in Block 9. Use Block 10 of the SF 255 to provide any additional information desired. Personal interviews may not be scheduled prior to selection of the most highly qualified firm. SF 255's shall not exceed 30 printed pages (double sided is two pages/organizational charts and photographs excluded, with the exception that photographs with text will be considered as a page). All information must be included on the SF 255 (cover letter, other attachments and pages in excess of the 30 page limit will not be included in the evaluation process). Firms not providing the requested information in the format (i.e. listing more than a total of 10 projects in Block 8, not providing a brief description of the quality control plan, etc.) directed by this synopsis may be negatively evaluated under the appropriate selection criterion. Firms which design or prepare specifications for a construction contract or procurement of supplies cannot provide the construction or supplies. This limitation also applies to subsidiaries and affiliates of the firm. This is not a request for proposal. Telegraphic and facsimile SF 255s will not be accepted. Site visits will not be arranged during the submittal period. (0340)

Loren Data Corp. http://www.ld.com (SYN# 0020 19961209\C-0006.SOL)


C - Architect and Engineering Services - Construction Index Page