|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- Z-FIRST AND SECOND FLOOR INTERIOR
- HVAC MODIFICATIONS
- INSTALL POWER FACTOR CORRECTION CAPACITOR AT CG, ISC
- REPAIR EXTERIOR FACILITY 20023
- RENOVATE INTERIOR (OLD BANK AREA) OF BUILDING 38 WEST
- PAVING MAINTENANCE AND STRIPIING
- WASTEWATER PH MONITORING/COMPLIANCE SAMPLING AND
- MAINTENANCE DREDGING, NAVAL STATION, NORFOLK, VIRGINIA
- REPAIR TWO EXISTING CANAL PLUGS: EAST CAPE CANAL PLUG
- REPLACE SEWAGE LAGOON, LONGSTREET, FORT A. P. HILL,
- ROOF, SIDING, AND SHEET METAL WORK
- REMOVAL OF UNDERGROUND STORAGE TANKS
- INSTALL POWER FACTOR CORRECTION CAPACITOR AT CG, ISC
- Z-REPAIR/REPLACE HVAC, BUILDING 55, EGLIN AFB FL
- Z-REPAIR/REPLACE HVAC, BUILDING 55, EGLIN AFB FL
- Z-REPAIR LIGHTNING PROTECTION SYSTEM, BUILDING 40, EGLIN
- Z-REPAIR LIGHTNING PROTECTION SYSTEM, BUILDING 40, EGLIN
- Z REPLACE TAXIWAY LIGHTS AND CIRCUITS, EGLIN AFB FL
- Z REPLACE TAXIWAY LIGHTS AND CIRCUITS, EGLIN AFB FL
- RENOVATE BOWLING CENTER, NAVAL SUBMARINE BASE, KINGS
- WASTEWATER PLANT UPGRADE, NAVAL AIR STATION, KEY WEST,
- HANGAR 51 RENOVATION, NAVAL AIR STATION, CORPUS
- REMOVE, REPLACE EXISTING FURNACES, WATER HEATERS,
- SIMPLIFIED ACQUISITION FOR BASE ENGINEERING
- CORRECT HUMIDITY PROBLEM, BUILDING 373, EGLIN AFB, FL
- ELECTRICAL POWER SURVEY
- REPLACE F-76 PUMPS DFSP PROJECT #SPO 93-9, DEFENSE
Today's CBD Index Page
Created on December 5, 1996 by Loren Data Corp. --
info@ld.com
|
|
|