|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 10,1996 PSA#1738Commander, U.S. Army Engineer Waterways Experiment Station, Corps of
Engineers, 3909 Halls Ferry Road, Vicksburg, MS 39180 66 -- AUTOMATED PRESSURE CONTROL SYSTEM SOL DACW39-97-Q-0016 DUE
122396 POC Mallorie O. Irwin, Purchasing Agent, (601)634-4116 WEB:
Contracting Division Homepage, http://www.wes.army.mil/contract.htm.
E-MAIL: Mallorie Irwin, irwin@ex1.wes.army.mil. The USAE Waterways
Experiment Station (WES) proposes to award a contract to Advanced
Pressure Products, Ithaca, NY under authority 10 U.S.C.2304(c)(1)for
the purchase of an automated pressure control system for a
visco-elastic concrete properties laboratory. The system must be
commercially available. The automated pressure control system must be
capable of controlling and independently pressurizing or depressurizing
12 different experimental stations to different hydraulic pressures or
pressure ramps for separate creep/relaxation conditions from two
independent controllers. The system shall be capable of operating with
either or both controllers under a Windows NT-based data acquisition
and control program capable of running on pentium or pentium pro
personal computers (PC). Each station must include a motorized,
piston-driven pressure generator for precise control of pressure with
12-bit control over motor speed and pressurization rate, two automated
on-off motorized high-pressure valves, and a high-pressure transducer.
The controllers must provide computer-driven, multiple fail-safe
mechanisms against overpressure with automatic fluid refilling and
automatic priming for each pressure generator with full manual-override
control. The controllers must be capable of interfacing with the PC
through an RS-232 port. Data must be capable of being collected in a
variety of user-selected formats for transfer to other computers. The
maximum pressure for each generator is 5000 psi with a system
resolution of +/- psi. The controller software must operate under
Windows NT 4.0 and provide multiple-slope pressure ramps and long-term
constant pressure meeting resolution specifications for
constant-stress creep experimentation. Automatic pressurization
functions must be capable of being modified while an experiment is
underway. The software must also provide control for stress relaxation
experimentation. The PCs shall be provided separately and are not
included in this contract. Required delivery time is 12 weeks after
receipt of notice of award. In the event no other sources are found,
the U.S. Government intends to award a contract to Advanced Pressure
Products. Solicitation documents are not available. Any inquiries
should be received within 15 days from the date of publication of this
notice. (0341) Loren Data Corp. http://www.ld.com (SYN# 0236 19961210\66-0004.SOL)
66 - Instruments and Laboratory Equipment Index Page
|
|