COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 12,1996 PSA#1740U.S.P.F.O. for MA, Contracting, 143 Speen St., Natick MA 01760-2599 Z -- UPGRADE HEATING DISTRIBUTION SYSTEM SOL DAHA19-97-B0001 DUE
012397 POC William B. Devitt, Contract Specialist, 508-233-5761 FAX
508-233-6122. PRE-SOLICITATION: The project covered by this statement
consists of furnishing all plant, labor, supplies, equipment, materials
and transportation for upgrading the heating system for the main
aircraft hangar (Building #15) in accordance with the Plans and
Specifications. The project includes replacing an existing boiler and
converting another boiler to hot water. Heat fixtures and piping will
be replaced. Work involves all associated demolition, some site work,
removal of trench drains and associated electrical work and does
include asbestos removal. Project has critical time parameters as
follow: a. Heat system will not be off prior to 15 April 97, b. Hangar
will be available for use during June 1997. There is one additive bid
item for painting and sealing the hangar floor. All work to be
performed at Barnes Air National Guard Base, Westfield, MA in
accordance with the plans and specifications. Performance period is for
180 days after receipt of the Notice to proceed. Estimated magnitude of
construction is between $250,000.00 and $500,000.00. Interested parties
qualified to perform work under SIC 1711, Plumbing, Heating and Air
Condi-tioning, should notify this office, in writing, of their intrest
in bidding as the prime contractor. Bid packages are not yet available
but anticipated issue date is on/about 23 DEC 96. (0345) Loren Data Corp. http://www.ld.com (SYN# 0099 19961212\Z-0006.SOL)