|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 16,1996 PSA#1742NASA/GSFC, Code 214.2, Greenbelt, Md 20771 99 -- LOAN OF PROTOTYPE INSTRUMENTS FOR GEOSTATIONARY OPERATIONAL
ENVIRONMENTAL SATELLITES (GOES) POC Clelia Walker, Contracting Officer,
Code 214.2, (301)286-1351. The Goddard Space Flight Center (GSFC)
intends to loan two prototype instruments, designated the Geostationary
Operational Environmental Satellite (GOES) SN01 sounder and SN02
imager, to the Hughes Space and Communications Company of El Segundo,
California. GOES is a three-axis stabilized satellite that allows the
instruments to continuously view the Earth for weather forecasting. The
purpose of the loan is to allow Hughes to conduct tests to verify their
understanding of the instrument interfaces and to demonstrate
compatibility between the imager/sounder design and the Hughes
spacecraft. The loan will be on a non-interference basis to the
Government and at no cost to the Government. Terms of the loan are
described below. The SN01 sounder and/or the SN02 imager may be loaned
to other interested spacecraft manufacturers, subject to the same
terms and conditions. Any interested company must contact the
Contracting Officer listed above to indicate their intent within 15
days of the publication date of this synopsis, requests received after
this time period will not be considered. The company must be a viable
offeror for the GOES-NOPQ spacecraft procurement and must make
arrangements for the loan with both GSFC and ITT. The company must also
demonstrate sincere interest by submitting a test plan which meets the
criteria described below. GSFC reserves the right to refuse a request
from any company not presenting a compelling rationale for the loan.
As these loans are to be made on a non-interference basis to the
Government, if more requests are received than the GOES Program can
accommodate, all loans will be canceled. Equipment to be loaned: --
SN02 pathfinder imager instrument, valued at $20M and consisting of: 1
sensor module; 1 electronics module; 1 power supply. -- SN01 prototype
sounder instrument, valued at $1.5M and consisting of: 1 sensor module;
1 electronics module; 1 power supply. -- Test equipment, valued at $4M
and consisting of: 2 test harnesses; 2 portable test units; 6 transit
cases; assorted other test equipment as required for test.
Instructions: -- The SNO2 imager and SN01 sounder are to be treated as
flight hardware. Handling shall comply with all requirements
(contamination control, electrostatic discharge, etc.) levied by ITT.
-- A test plan shall be provided to the NASA/GOES project prior to
execution of loan agreement. This plan shall include: purpose of test;
test methodology; schedule/test duration; how the imager/sounder will
be used; how the imager/sounder will be interfaced with spacecraft
test equipment. -- A test procedure shall be provided to the NASA/GOES
project at least one week prior to test. -- Any and all costs incurred
by ITT in the preparation, execution, and analysis of this test will be
covered by a direct agreement between the spacecraft manufacturer and
ITT. This agreement shall include: shipment of equipment to and from
spacecraft facility; execution of functional electrical test prior to
and following each shipment; development and/or modificationof
procedures required for testing; ITT engineer and test operator support
during testing; ITT site survey prior to instrument arrival at
spacecraft facility. -- GSFC reserves the right to be present during
the site survey and all testing. Liability: The borrower shall be
responsible to pay 100% of the repair or replacement cost up to the
full value of the loaned equipment to compensate for any and all damage
occurring during transport to, testing at, and return from the
spacecraft facility, regardless of cause or fault. (0347) Loren Data Corp. http://www.ld.com (SYN# 0425 19961216\99-0003.SOL)
99 - Miscellaneous Index Page
|
|