COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 24,1996 PSA#1748Commanding Officer, Navy Public Works Center, Naval Facilities
Engineering Command Contracts, Bldg. 55, Pearl Harbor, HI 96860-5470 C -- DESIGN AND ENGINEERING SERVICES FOR THE PREPARATION OF
CONSTRUCTION DRAWINGS, SPECIFICATIONS AND COST ESTIMATE FOR THE SHEET
PILE REPAIRS TO WHARFS S374 AND A7, PEARL HARBOR, HAWAII SOL
N62755-97-R-0943 DUE 012797 POC J. SHIMODA, 808/474-1513/Contracting
Officer, A.Yuen, 808/474-1513. This solicitation is for design and
engineering services for repairing the sheet pile bulkhead at Wharf
S374, Ford Island and Wharf A7, Bishop Point, Naval Station, Pearl
Harbor, Hawaii. The work includes, but is not limited to providing new
steel sheetpile bulkhead and tie-back system, cathodic protection
system for the new sheet piles, new concrete pile cap, new concrete
slab, deck accessories and miscellaneous utility work. The contract may
include an amount for post construction award services. These services
generally will involve but are not limited to review of construction
contractor submittals, preparation of as-built drawings, and office and
site consultation services. We will normally not require post
construction award services more than 18 months after completion of the
design. The project scope(s) may require evaluation and definition of
asbestos materials, toxic waste disposition and/or pollution control
wrok. Firms must accept these requirements as a part of their contract
responsibility. The contract requires that all construction contract
specifications use the SPECINTACT system. Estimated construction cost
of project is $3, 510, 000. Estimated design start date is June 1997.
We will use the follwing selection criteria, in relative order of
importance, to evaluate and select qualified architect-engineer (A-E)
firms. (1) Professional qualifications of firm and staff proposed for
performance of required services. (2) Specialized recent experience and
technical competence of firm or particular staff members in
reconstructing piers. Submit a list of (3) references with phone
numbers and person to contact. (3) Capacity to accomplish the work in
the required time. (4) Past performance on contracts with Government
agencies and private industry in terms of cost control, quality of
work, and compliance with performance schedules. Discuss: a) the
process for cost control and the key person responsible, b) the process
for compliance with quality control and the key person available, c)
the process for compliance with the performance schedule and the key
person responsible, i.e., description of how work will be accomplished
in the required time, including the composition of the team and
availability of staff, and the A-E firm's design quality control
practices/techniques. (5) Location in the general geographical area of
the project and knowledge of the locality of the projects, list
projects completed in that geographical area and give particular
conditions of that area, provided, the application of this criterion
leaves an appropriated number of qualified firms, given the nature and
size of the project. (6) Demonstrated success in prescribing the use
of recovered materials and achieving waste reduction and energy
efficiency in facility design. (7) The volume of work previously
awarded to the firm by the Department of Defense during the previous 12
months shall also be considered, with the object of effecting an
equtable distribution of Department of Defense A-E contracts among
qualified A-E firms, including small and small disadvantaged business
firms, and firms that have not had Department of Defense contracts.
This prospective contract is a potential 100 percent set-aside for
small business (SB) concerns. The small business size standard
classification is SIC 8711 ($13.5 million in annual receipts). A-E
firms meeting the requirements described in this announcement must
submit complete, updated Standard Forms 254, Architect-Engineer and
Related Service Questionnaire, and 255, Architect-Engineer and Related
Services Questionnaire for Specific Project to the office shown above.
A-E firms' subconsultants must also submit completed Standard Forms 254
and 255. Responding FIRMS SHALL SPECIFICALLY ADDRESS ALL OF the listed
selection criteria so the Government can properly evaluate the
qualifications of firms APPLYING. FAILURE TO ADDRESS ALL THE CRITERIA
may be GROUNDS FOR NON-SELECTION. We need only one copy of all forms.
Clearly show the office location where you will do the work and the
experience of those that will do the work and their location. Submit
forms to this office by 2:00 p.m. HST on 27 January 1997. See Note 24.
This is not a request for a proposal. (0355) Loren Data Corp. http://www.ld.com (SYN# 0015 19961224\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|