|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 02,1997 PSA#1753U.S. Army Corps Of Engineers, Fort Worth District, P.O. Box 17300, 819
Taylor Street, Attn: CESWF-CT, Fort Worth, TX 76102-0300 B -- TEN YEAR POST IMPOUNDMENT STUDY FOR RAY ROBERTS LAKE, TEXAS SOL
DACW63-97-B-0017 DUE 022297 POC KAREN R. SMITH, 817/978-7471, Contract
Specialist WEB: Corps of Engineers, Fort Worth District, Contracting
Division, http://www.ed1.swf.usace.army.mil/contract/. E-MAIL: Karen
Smith, Contract Specialist, karen.smith@SWF01.usace.army.mil. The
proposed contract action is for services for which the Government
intends to solicit and negotiate for the services of a ten-year post
impoundment study. Delivery will be on or about 30 September 1999, to
U.S. Army Engineer District, Fort Worth, Environmental Resources
Branch, P.O. Box 17300, Fort Worth, TX 76102-0300. This proposed
10-year Post-Impoundment study will document and compare project
effects on land use, water, vegetation, fish and wildlife resources,
socioeconomics and other environmental parameters during the first 10
years after impoundment. Offeror will furnish technical supervisory,
and administrative personnel in addition to all sampling gear, lab
materials, transportation and expendable items for the project. The
offeror will provide documentation and comparison to conditions
described in the pre-impoundment and 2-year and 5-year post-impoundment
reports and in the Environmental Impact Statement for the project. The
10-year post-impoundment study will include: land use identification
and mapping of the broad study area with quantitative habitat typing
and analyses of change, utilizing methods compatible to those used in
the previous studies: characterization of water quality relative to
temperature, pH, dissolved oxygen, fecal coliforms, nutrients, and
other parameters measured during the initial study and any additional
parameters which are determined by characterization of the new lentic
situation. Water quality determinations will be preformed at riverine
stations used on the previous pre and post-impoundment studies and data
will be compared and contrasted to data from other lakes not impounded
by the reservoir which have been previously used for comparison in the
2-year and 5-year post-impoundment studies. Fisheries sampling will be
conducted to determine species present, diversity, and relative
abundance at different locations within the lake to show representation
of the various habitats and fish species occupying them. Sampling will
be conducted at the riverine stations usedin pre and post impoundment
studies. Coordination with Texas Parks and Wildlife Department will be
integral to the fisheries evaluations in terms of information
concerning stocking, introductions, and standing crop or biomass
estimates and creel surveys. Portions of the permanent terrestrial
transects and sample plots not inundated by the reservoir will be
sampled for density and dominance of vegetation and compared to the
previous studies. Monitoring, timing frequency, and duration of
sampling will be the same as for the previous studies. Wildlife species
composition by habitat type by season will be compared and contrasted
to vegetative densities and dominance for this study as well as to
previous studies. Recreation activity and secondary socioeconomic
impacts of the project on the broad study area will be monitored during
the 10-year post-impoundment evaluation. Coordination will be
maintained by the contractor with the Texas Parks and Wildlife
Department on recreation use including fishing and hunting on project
lands. Socioeconomic conditions within the broad study will be
documented. These conditions will be compared and contrasted to
pre-impoundment, 2-year and 5-year post-impoundment conditions where
the literature permits, otherwise the baseline will be established for
comparison with those conditions during this 10-year post-impoundment
interval. Solicitation will issue on or about 23 January 1997 with bid
opening on or about 22 February 1997. All responsible sources may
submit a bid which shall be considered by the agency. Facsimile
requests for solicitation documents are acceptable (FAX # 817/978-4797,
ATTN: Karen Smith). No express mail procedures will be utilized on
initial mailing of solicitation packages. (0365) Loren Data Corp. http://www.ld.com (SYN# 0007 19970102\B-0002.SOL)
B - Special Studies and Analyses - Not R&D Index Page
|
|