COMMERCE BUSINESS DAILY ISSUE OF JANUARY 6,1997 PSA#1755DEPARTMENT OF THE ARMY, ATTN: SIORI-CTC, ROCK ISLAND ARSENAL, ROCK
ISLAND,IL 61299-5000 Z -- REPAIR NATURAL GAS DISTRIBUTION TO BUILDING 220 AND 222, MES
18-97. SOL DAAA08-97-Q-0107 DUE 012797 POC Purchasing Agent Mr. Wayne
C. Cole (309) 782-8536 (Site Code DAAA08) MES 18-97. Repair Natural Gas
Distribution To Building 220 And 222. One Job. FOB: Destination, Rock
Island Arsenal, Rock Island, IL. 61299-5000. The base quote work
consists of the following features, but not limited to these features:
1. Remove exising Roots 5M rotary meter from basement tunnel in
building 222 and salvage for reinstallation. This meter is on a 30 psi
main. Remove existing EMCO diaphragm meter from beneath steps in
building 222. This meter is on a 30 psi main. Provide welded pipe spoos
where rotary and diaphragm meters were removed. 2. Remove existing
diaphragm meter from building 91 and install salvaged Roots 5M meter
from building 222. Dispose of diaphragm meter off the Arsenal. 3.
Remove two existing weighted Fisher #26 regulators from basement pit in
building 222. Remove two existing Fisher 703B regulators at stairs in
building 222. Remove existing Fisher regulator from building 220.
Provide wlded pipe spools where regulators are removed. 4. Excavate to
expose 4" black iron, 30 psimain from horizontal underground
transition east of valve number 102 to north wall of building 222.
remove section of main between horizontal underground translationeast
of valve number 102 and interior of building 222. Provide anode and
cathodic test station. 5. Provide transition between 4" steel piping
and new 3" PE piping, 3" anodeless riser, line valves, 16M rotary meter
set, 30# unregulated service, 2# regulated service, 2.25# pressure
relief regulated service leg, two wall penetrations, and welded steel
piping between meter set and existing piping to remin on interior of
building 222. 6. Provide 1" PE piping, 1" PE valve and box, anodeless
riser, regulator and meter set, wall penetration, and steel piping
between meter and existing piping to remain on interior of building
220. 7. Remove existing piping beween buildings 220 and 222 that
traverses in the utility tunnel. Cap at building 222 as required.
Delivery time is 75 calendar days. Approximate issue date is 28 Jan 97
with opening date 14 days from issue. Firms interested in receiving
request for quotation package should FAX (309) 782-6727/3721. All
responsible sources may submit a proposal which shall be considered by
the agency. The proposed contract listd here is unrestricted. (0366) Loren Data Corp. http://www.ld.com (SYN# 0124 19970106\Z-0002.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|