USPFO -- Purchasing and Contracting Office, 660 South Aspen Street, Building 1005, Stop 67, Buckley ANG Base, Aurora, CO 80011-9551

C -- ARCHITECTURAL & ENGINEERING SERVICES INFRASTRUCTURE IMPROVEMENT SOL DAHA05-97-R-0004 POC Debbie Carroll, Contract Specialist, (303) 340-9945 or David Cole, Contracting Officer, (303) 340-9945. Architectural & Engineering Services (SIC 8712) required to prepare plans, specifications and cost estimates for construction of roads, pass and I.D. facility, electrical and communication distribution, potable water, fire suppression system, sanitary sewer mains, security guardhouse, storm drainage detention/retention ponds, gas and landscaping. Services will consist of updates and additions to an existing design completed 3 years ago. The selected A-E shall be responsible for integration of new and existing work. The A-E shall also ensure the existing design conforms to current Code and Criteria. All drawings must be submitted in AutoCADD format. The services required are for Title I, Type A Investigative Services. The Government reserves the option to negotiate for the performance of Type B Design and C Surveillance/Inspection Services. The estimated construction cost is more than $10,000,000.00. Significant Evaluation Factors in order of importance are: (1) Professional qualifications necessaryfor satisfactory performance of required services; (2) Specialized experience and technical competence in the above mentioned type of work required; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location relative to Buckley ANG Base and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature of size of the project; and (6) Demonstrated success in prescribing the use of recovered materials and achieving waste reduction and energy efficiency in facility design. Those firms which meet the requirements described in this announcement and wish to be considered must submit one (1) copy of both SF 254 and SF 255 on or before close of business thirty (30) calendar days from the date of the appearance of this announcement in the CBD (should thedue date fall on a weekend or holiday, these forms will be due the first workday thereafter). This is not a request for proposal. Site visits will not be arranged during the submittal period. The anticipated award time is July 1997. The performance period is approximately six months. Provide a list of work accomplished for the Air National Guard in the past five (5) years. Indicate solicitation DAHA05-97-R-0004 in block 2B of the SF 255. This requirement is offered UNRESTRICTED and is open to small and large businesses. A firm-fixed price contract is anticipated. (0024)

Loren Data Corp. http://www.ld.com (SYN# 0021 19970128\C-0005.SOL)


C - Architect and Engineering Services - Construction Index Page