COMMERCE BUSINESS DAILY ISSUE OF JANUARY 28,1997 PSA#1770AETC CONS/LGCR 550 D Street East Ste 08 Randolph AFB TX 78150-4434 Y -- ADD/ALTER COMMISSARY FACILITY -- IFB AT NAVAL AIR STATION MIRAMAR
CA SOL F41689-97-B-0002 DUE 043097 POC Tommie Thornton, (210) 652-3845
The work to done includes but is not limited to the following:
Construction includea 21, 000 square foot addition to the west end of
the existing commissary building allowing for new staging/receiving
area, new administration offices, new bakery/deli area, new frozen food
freezer, new dairy storeage room new employee breakroom and restroom,
new contract stocker room, new damage merchandise room. In addition,
construction will include an expansion o the front end of the store to
allow for expansion of the sales area, new cashier/cash counting
office, new patron restrooms. The alterations to the store will include
demolition of existing admin ofices, cold storeage rooms, exterior
canip, etc., for making the renovations that will include but not
limited to new walk in coolers, new fish processing area, expansion of
the frozen food sales area, expansion of the produce department,
expansion of the sales area, expansion of the checout area, new
shopping cart storeage, relocation of existing new refrigerated display
cases as well as new refrigeration compressor racks will be required,
new HVAC equipment will be required, and new non-refrigerated
equipment. Sitework is required for new additions, and alterations will
include some abstos and lead paint abatement, as well as roof
replacement Phasing of overall construction work will be required
through the duration of the project to allow for full operation of the
commissary. Proposed procurement is open to both large and small
business concertns. The magnitude of construction is between
$5,000,000.00 and $10,000,000.00. Bid gurantee is required . Bid
package should be available on or about 15 March 1997. Request for
solicitation packages must be in writing. Fax requests to (210)
652-2737. Requests must include the 9 digit zip code. Time for project
completion is approx. 14 months. BOD is approx. (0024) Loren Data Corp. http://www.ld.com (SYN# 0117 19970128\Y-0021.SOL)